Archive of Updates from ISROHome /Archives

Archived Highlights Archived Recent Updates
Date Title
April 21, 2025 SPADEX Mission: Successful demonstration of Second Docking and Power Transfer
April 18, 2025 Wheat Crop Area and Production Estimation in India: A Pilot on Framework Development
April 18, 2025 ISRO Successfully qualifies fourth stage engine of PSLV with Stellite Nozzle Divergent
April 10, 2025 Commencement of ISRO Academia Connect Programme at NIT Kurukshetra for Northern Region
April 04, 2025 ISRO Commissions Advanced Landing Gear Test Facility
April 04, 2025 Atmospheric Re-entry of POEM-4
April 04, 2025 NATIONAL LEVEL USER INTERACTION MEET 2025 AT NRSC
April 03, 2025 Ocean Colour Monotor-3(OCM-3) Satellite Imagery and Vegetation Dynamics: Unveiling Global Patterns
April 01, 2025 Leveraging Indian National Satellite System (INSAT) Geostationary Satellite for advanced lightning detection and analysis
March 31, 2025 ISRO's Cartosat-3 image shows damage caused by the Earthquake in Myanmar on 28 Mar 2025
March 29, 2025 Space Applications Centre (SAC)-ISRO in Association with IN-SPACe and NSIL to Organize a One-Day NISAR Awareness Workshop for Indian Non-Governmental Entities (NGEi) at Ahmedabad, on 29 April 2025
March 29, 2025 Rashtriya Karmayogi- Jan Seva Programme in Department of Space
March 28, 2025 ISRO achieves major breakthrough in Semicryogenic Engine development
March 28, 2025 ISRO successfully completes 1000hrs Life Test of Stationary Plasma Thruster for Spacecraft Electric Propulsion System
March 24, 2025 IIRS Academia Meet (IAM-2025) organized at IIRS on March 21, 2025
March 21, 2025 ASEAN Food Security Information System (AFSIS) Appreciates ISRO
March 21, 2025 Secretary, DoS/Chairman, ISRO Interaction with various Secretaries of Ministries/Departments on current utility of space technology and future Direction
March 20, 2025 Inauguration of Space Technology Incubation Centre (STIC) Facility at NIT, Rourkela by Secretary, DOS / Chairman, ISRO
March 20, 2025 Italian Ambassador met Chairman, ISRO/ Secretary, DOS
March 19, 2025 Visit of Minister of Foreign Affairs, Latvia to Antariksh Bhavan
March 18, 2025 Inauguration of Centre of Excellence at IIT Madras
March 18, 2025 Prediction of Equatorial Plasma Bubble Formation
March 15, 2025 Cryogenic Upper Stage (C25) for LVM3 flagged off to Sriharikota
March 15, 2025 ISRO & SCL develops 32-bit Microprocessors for space applications
March 14, 2025 ISRO successfully conducted the flight acceptance hot test of CE20 Cryogenic Engine for LVM3-M6 Mission
March 14, 2025 India Bags the Credit for First-Ever In-Situ Measurement of the Topmost Fluffy Layer of the Moon’s Surface at Southern Higher Latitudes: New Insight about Harbouring Water-ice on the Moon
March 13, 2025 SPADEX UNDOCKING SUCCESSFUL
March 07, 2025 Commencement of the construction of SSLV Launch Complex at Kulasekarapattinam, Tamil Nadu
March 07, 2025 POEM Completed 1000 Orbits in Space
March 07, 2025 Multiple restarts of Launch Vehicle Stages - ISRO successfully carried out ignition trial using Spark Torch Igniter
March 07, 2025 Chandrayaan-2 unveils the effect of the Earth’s geomagnetic tail on the Lunar ionosphere plasma
February 28, 2025 Historic First: India’s Solar Ultra-violet Imaging Telescope (SUIT) onboard Aditya-L1 Captures Unprecedented Solar Flare Details
February 25, 2025 Release of the Second Set of Aditya-L1 Science Data
February 13, 2025 Development & Realisation of 10 ton Propellant Mixer for Solid motors of ISRO
February 12, 2025 PRL Scientists Discovered a Dense Sub-Saturn Using PARAS-2 Spectrograph at Mt Abu Telescope
February 11, 2025 The Charge D'Affaires, Embassy of USA to India met Chairman, ISRO/ Secretary, DOS
February 11, 2025 Russian Ambassador met Chairman, ISRO/Secretary, DOS
February 11, 2025 Successful accomplishment of joint ISRO-ESA Radio Frequency Compatibility Tests (RFCT) for Gaganyaan Missions
February 08, 2025 Preparing for inflight re-ignition – Vacuum ignition trial of Cryogenic engine with Multi-element Igniter conducted successfully
January 22, 2025 Liquid Propulsion Systems integrated on Crew Module for first uncrewed mission of Gaganyaan (G1)
January 17, 2025 ISRO successfully completed docking of two SPADEX satellites (SDX-01 & SDX-02) in the early hours of 16 January, 2025.
January 17, 2025 Core Liquid stage for LVM3 flagged off to Sriharikota
January 17, 2025 ISRO demonstrates restart of Vikas engine
January 16, 2025 Cabinet approves the establishment of “Third Launch Pad”
January 13, 2025 Dr. V. Narayanan Assumed Charge of Secretary, Department of Space and Chairman, Space Commission
January 13, 2025 Chairman, ISRO / Secretary, DOS Inaugurated START-2025 Event
January 07, 2025 CROPS: A Leap in Space Biological Experiments
January 07, 2025 ISRO Organises National Meet on Aditya L1 Data Release and Payload Performance Appraisal
December 24, 2024 Memorandum of Understanding between Indian Navy and NARL
December 21, 2024 PSLV C60/SPADEX Mission : SpaDeX Deployed! Successful separation of SpaDeX satellites marks another milestone in India's space journey
December 22, 2024 POEM-4 in PSLV-C60 / SpaDeX Mission
December 22, 2024 Hon'ble Union Home Minister Highlights Space Technology as Catalyst for NE Region's Development at 12th NESAC Society Meeting in Agartala
December 21, 2024 SpaDeX: India's Pioneering Space Docking Demonstrator for Future Space Exploration
December 21, 2024 ISRO-ESA Agreement for Cooperation on Activities related to Astronaut Training, Mission Implementation and Research Experiments
December 18, 2024 Gaganyaan-G1 Launch campaign commences: Human Rated LVM3 assembly starts at SDSC for the first un-crewed flight
December 17, 2024 Charting the Shadows of Time: Sundial at VSSC Space Museum
December 13, 2024 ISRO & IN-SPACe organize Workshop on Spin-Off Space Technologies for Automotive Industry
December 11, 2024 Preparing for inflight re-ignition, full nozzle cryogenic engine (CE20) undergoes test outside vacuum chamber.
December 10, 2024 Unlocking the Mysteries of the Sun: Aditya-L1's Observations of a Coronal Mass Ejection
December 09, 2024 Indian Navy and ISRO gear up for Welldeck Recovery for Gaganyaan
December 04, 2024 ISRO - ESA Signs Technical Implementing Plan for Network Operation Support for Gaganyaan Missions
December 02, 2024 The PSLV-C59/PROBA-3 Mission has successfully achieved its launch objectives, deploying ESA’s satellites into their designated orbit with precision.
November 29, 2024 Satellite Observation of Deep Depression over Southwest Bay of Bengal
November 21, 2024 Member of Parliament and Commissioner “Start-ups and Digital Innovation Hubs” at the German Ministry of Economic Affairs and Climate Action, met Chairman, ISRO/ Secretary DOS
November 20, 2024 ISRO & ASA sign Implementing Arrangement for Gaganyaan
November 12, 2024 Mexican Ambassador met Chairman, ISRO / Secretary, DOS
October 25, 2024 Department of Biotechnology (DBT), Ministry of Science and Technology and Indian Space Research Organisation (ISRO), Department of Space (DoS) signs Framework Memorandum of Understanding on Cooperation in Space Biotechnology
October 24, 2024 ISRO Satellites track Cyclone DANA
October 10, 2024 India's AstroSat and NASA's Space Observatories Capture Dramatic Eruptions from Stellar Wreckage around a Massive Black Hole
October 08, 2024 The upper stage of PSLV-37 which launched a record number of 104 satellites re-enters the Earth's atmosphere on 6 Oct 2024
September 30, 2024 Union Cabinet Approves India's Mission to Venus, and Sample Return from the Moon
September 30, 2024 Discovery of a buried crater on the moon! chandrayaan-3 vikram lander and pragyan rover landed within it
September 26, 2024 Swedish State Secretary for Foreign Trade, met Chairman, ISRO/ Secretary DOS
September 25, 2024 Bengaluru Space Expo (BSX) 2024
September 19, 2024 EOIR Payload on EOS-08 Begins Operations, Offering excellent Thermal Imaging Capabilities
September 5, 2024 ISRO and IIG Sign MOU for Scientific Collaboration
August 28, 2024 GNSS-Reflectometry: A Novel Remote Sensing Initiated by EOS-08
August 23, 2024 Release of Chandrayaan-3 science data to the Scientific Community
August 21, 2024 APXS on Pragyan Rover of Chandrayaan-3 made the First Elemental Abundance Measurements
August 08, 2024 SSLV-D3 Mission: The third developmental flight of SSLV is successful. The SSLV-D3 placed EOS-08 precisely into the orbit
August 6, 2024 EOS-08 Mission Overview
July 22, 2024 ISRO conducts flight experiment of Air Breathing Propulsion System
July 05, 2024 Launching of Bhartiya Antariksh Hackathon-2024
July 02, 2024 Aditya-L1 Mission: Completion of First Halo Orbit
June 26, 2024 Thailand Ambassador met ISRO Chairman
June 18, 2024 Shri Suresh Gopi, Hon'ble Minister of State, meets Shri S. Somanath, Chairman, ISRO
June 18, 2024 LVM3 M3 Upper Stage Re-enters Atmosphere: Mission Debrief
June 14, 2024 GSAT-N2: Enhancing India's Broadband Infrastructure
June 10, 2024 Aditya-L1’s SUIT and VELC Capture Solar Fury
June 5, 2024 TRISHNA Mission: Advancing High-Resolution Thermal Imaging for Climate and Resource Management
June 1, 2024 Handholding Start-ups: Towards a Vibrant Space Ecosystem
May 31, 2024 Visit of French Delegation to ISRO
May 24, 2024 The Ambassador of the United States to India visited ISRO
May 20, 2024 High Energy X-ray Modulation Discovered in Swift J1727.8-1613 Black Hole with AstroSat
May 17, 2024 ISRO Captures the Signatures of the Recent Solar Eruptive Events from Earth, Sun-Earth L1 Point, and the Moon - 2
May 14, 2024 ISRO Captures the Signatures of the Recent Solar Eruptive Events from Earth, Sun-Earth L1 Point, and the Moon - 1
May 13, 2024 Yuva Vigyani Karyakram (YUVIKA-2024) - Inauguration
May 10, 2024 ISRO successfully conducts long-duration hot tests of Additive Manufactured Liquid Engine.
May 6, 2024 Successful ignition test on Semi Cryogenic Pre-Burner Ignition Test Article (PITA)
April 30, 2024 Space Science Roadmap Formulation meeting
April 20, 2024 Satellite Technology Day – 2024 at URSC
April 15, 2024 ISRO Develops Lightweight Carbon-Carbon Nozzle for Rocket Engines, Enhancing Payload Capacity
March 28, 2024 ISRO Facilitates Indian Start-up's Rocket Motor Test
March 26, 2024 Announcement inviting project proposals from Indian researchers under NICES programme
March 25, 2024 PSLV accomplishes zero orbital debris mission
March 22, 2024 ISRO achieves yet another success in the RLV Landing Experiment
March 15, 2024 The Ambassador of Norway to India visited ISRO HQ
March 11, 2024 INSAT-3DS begins imaging the Earth
March 9, 2024 Danish Parliamentarians visited ISRO/DoS officials
February 29, 2024 Hon'ble Prime Minister of India Shri Narendra Modi visited VSSC
February 28, 2024 Honourable Prime Minister Lays the Foundation Stone for India's Second Spaceport
February 23, 2024 Minister of Austria met Chairman, ISRO / Secretary, DOS
February 23, 2024 Sweden Minister met Chairman ISRO/ Secretary DOS
February 22, 2024 PAPA payload aboard Aditya-L1 detects solar wind impact of Coronal Mass Ejections
February 21, 2024 Successful completion of Human rating of CE20 Cryogenic engine for the Gaganyaan Programme
February 13, 2024 POLIX onboard XPoSat commences its observations
February 8, 2024 GSLV-F14/INSAT-3DS MISSION
January 27, 2024 INSAT-3DS Satellite Flagged off to SDSC-SHAR
January 27, 2024 POEM-3 Mission achieves all its Payload objectives
January 25, 2024 SSPACE/IIST lends tracking support to space startup
January 25, 2024 Successful Deployment of Magnetometer Boom on Aditya-L1 in Halo Orbit
January 19, 2024 Instrument on Chandrayaan-3 lander started serving as a location marker near lunar south pole
January 16, 2024 Inauguration of Second Generation Distress Alert Terminal
January 11, 2024 XSPECT payload performance verified with Cas A observation
January 6, 2024 Halo-Orbit Insertion of Aditya-L1 Successfully Accomplished
January 5, 2024 Flight Demonstration of Si-Gr anode based High Energy Density Li-ion Cells
January 5, 2024 ISRO’s Fuel Cell flight tested in PSLV C58
December 29, 2023 Release of RESPOND BASKET 2023
December 23, 2023 Release of text book on Finite Element Analysis using 'FEASTsmt' software
December 08, 2023 Aditya-L1's SUIT captures full-disk images of the Sun in near ultraviolet wavelengths
December 04, 2023 Returns to home Earth: Chandrayaan-3 Propulsion Module moved from Lunar orbit to Earth's orbit ts
December 01, 2023 Aditya-L1's ASPEX instrument begins its measurements
December 01, 2023 High Commissioner of Australia met Chairman, ISRO / Secretary, DOS
November 30, 2023 NASA Administrator visited ISRO Centres
November 28, 2023 Kazakhstan Vice Minister visited ISRO/DOS Centres and had a meeting with Chairman, ISRO/ Secretary, DOS
November 28, 2023 Ambassador of France to India met Chairman, ISRO/ Secretary, DOS
November 25, 2023 ISRO celebrates diamond jubilee of first sounding rocket launch
November 22, 2023 Inauguration of Capacity Building Programme on "Geospatial Technologies and Applications" by Hon'ble MoS, DOS Dr. Jitendra Singh
November 22, 2023 Announcement of Opportunity (AO) for Capacity Building in Space Based Disaster Management Support
November 16, 2023 JPL Director visits ISRO HQ
November 15, 2023 Re-entry of Cryogenic Upper Stage of LVM3 M4
November 11, 2023 ISRO Robotics Challenge-URSC 2024 (IRoC-U2024): Inviting Indian students to join Space exploration
November 7, 2023 Ambassador of Republic of Tunisia met Chairman, ISRO / Secretary, DOS
October 20, 2023 Productionisation of PSLVs: industry delivers the propellant ingredients
October 20, 2023 20 Years of Excellence: IRS-P6 Celebrates Historic Anniversary
October 09, 2023 CE20 E13 Engine Hot Test for 22t Thrust Qualification
October 06, 2023 First Crew Module for Gaganyaan test flight takes shape
October 4, 2023 Satellite image-based studies of South Lhonak Lake
September 25, 2023 CE20 E13 Engine Hot Test for the Gaganyaan & 22t Thrust Qualification
September 18, 2023 An assessment of space situation around Sun-Earth Lagrange Point L1
September 08, 2023 Ch-2 orbiter Synthetic Aperture Radar images Ch-3 lander
August 31, 2023 High level Kenyan delegation visited ISRO HQ
August 18, 2023 The Oman Minister visited ISRO
August 17, 2023 Visit of the Mauritius Minister to ISRO enhanced the scope of India-Mauritius space cooperation
August 14, 2023 Workshop on Space Situational Awareness & Space Traffic Management (SSA & STM)
August 11, 2023 ISRO Conducts Drogue Parachute Deployment Tests for Gaganyaan Mission
August 08, 2023 Current Space Situation around the Moon – An assessment
August 08, 2023 Vice-Chair of Japan’s Committee on National Space Policy met Chairman, ISRO / Secretary, DOS
August 05, 2023 De-orbiting PS4 stage in PSLV-C56 Mission
July 28, 2023 NISAR Utilization Programme (NISAR UP) for Indian Researchers
July 27, 2023 Gaganyaan Mission: Successful second and third Hot Test of Service Module Propulsion System
July 22, 2023 ISRO Supports a space start-up's Rocket Engine Test
July 22, 2023 Commencement of Harbor Trials for the Gaganyaan Recovery operations
July 20, 2023 Gaganyaan Mission: Successful Hot Test of Service Module Propulsion System
July 13, 2023 NRSC/ISRO honoured with ESRI SAG Award 2023 for Outstanding Application of GIS Technology in Landslide Inventory
July 12, 2023 ISRO Unveils Vital Facilities for Solid Motor Advancement
July 03, 2023 First hot test of the Semi-cryogenic engine conducted at IPRC, Mahendragiri.
June 07, 2023 Norway explores Space Collaboration with ISRO
June 06, 2023 CNES and ISRO Foster Collaboration and Innovation in Space Arena
June 06, 2023 CEO of Arianespace called upon Chairman, ISRO
May 26, 2023 Scientists Discover an extreme Massive Giant and Most Dense Exoplanet
May 26, 2023 ISRO and the Indian Navy firm up the Crew Recovery Training Plan for Gaganyaan Mission
May 23, 2023 Amateur astronomers in ISRO capture rare celestial event with minimal equipment
May 19, 2023 Visit of President of the International Astronautical Federation (IAF)
May 15, 2023 Young Scientists Programme YUVIKA–2023 inaugurated by Chairman ISRO / Secretary DoS
May 12, 2023 Qualification of Crew Module Propulsion System for Gaganyaan Programme completed
May 10, 2023 Tests commenced on Semicryogenic engine at IPRC, Mahendragiri
May 09, 2023 National Workshop on “Earth Observations for Climate Services” held at the University of Kashmir (KU)
May 09, 2023 Centre for Space Science and Technology Inaugurated at IIT Roorkee
May 02, 2023 ISRO Offers Space science and Technology AwaReness Training (START) for the Post-Graduate and Final Year Undergraduate Students
Apr 27, 2023 NRSC/ISRO announces short courses on Remote Sensing Data Acquisition and Processing
Apr 20, 2023 Post Mission Disposal of GSAT-12
Apr 20, 2023 ISRO and MVA collaborate for the outreach of the Chandrayaan-3 Mission
Apr 12, 2023 One-day visit of IFS Officer Trainees
Apr 06, 2023 Successful completion of System Demonstration Model (SDM) tests for Crew Module Propulsion System for the Gaganyaan Programme
Apr 06, 2023 Successful completion of human rated Vikas engine test campaign for the L110 stage of Gaganyaan programme
Apr 03, 2023 Chandrayaan-3 Data Analysis Workshop for National Academia and Institutes
Apr 03, 2023 Indian Space Situational Assessment for the year 2022 – Highlights
Apr 02, 2023 ISRO successfully conducts the Reusable Launch Vehicle Autonomous Landing Mission (RLV LEX)
Mar 31, 2023 ESA Delegation Visits ISRO Centres
Mar 30, 2023 Australia's India-focused International Space Investment grants programme is open now
Mar 29, 2023 Global false colour composite mosaic generated from EOS-06 data
Mar 27, 2023 4th Indian Planetary Science Conference held at PRL, Ahmedabad
Mar 26, 2023 LVM3 M3/OneWeb India-2 mission accomplished successfully
Mar 24, 2023 ISRO receives the crew module structure simulated assembly
Mar 17, 2023 IRS 1A was launched this day (March 17) in 1988
Mar 16, 2023 French Parliamentarians visit ISRO
Mar 16, 2023 Chandrayaan-3 successfully undergoes Integrated Module Dynamic Tests
Mar 15, 2023 YUva VIgyani KAryakram (Young Scientist Programme) - 2023 is announced
Mar 13, 2023 Inauguration of India – Bhutan SAT ground station
Mar 10, 2023 CEO, Saudi Space Commission met Chairman ISRO/ Secretary DOS
Mar 08, 2023 NISAR (NASA ISRO Synthetic Aperture Radar) Satellite Update
Mar 07, 2023 Megha-Tropiques-1 (MT1) Controlled Re-entry Successful and impacted on the Pacific Ocean
Mar 06, 2023 ISRO conducts Rail Track Rocket Sled deployment tests of the Gaganyaan Pilot and Apex Cover Separation parachutes
Mar 05, 2023 Controlled Re-entry Experiment of Megha-Tropiques-1
Mar 02, 2023 SARAL completes a decade of service and continuing ……
Mar 02, 2023 Inauguration of Two-day National Conference on New Developments in Polymeric Materials, DPM 2023
Feb 28, 2023 A Comprehensive 3D Thermophysical Model for the Moon
Feb 27, 2023 Successful Flight Acceptance Hot Test of CE-20 Cryogenic Engine for LVM3-M4/Chandrayaan-3 Mission
Feb 24, 2023 Handing over of Simulated Crew Module Structure Assembly for Test Vehicle Mission
Feb 24, 2023 Ambassador of Argentina to India met Chairman, ISRO/ Secretary, DOS
Feb 20, 2023 Announcement of Opportunity (AO) soliciting proposals for 13th AO cycle observations
Feb 19, 2023 Chandrayaan-3 undergoes EMI/EMC test successfully
Feb 16, 2023 Chief of Defence Staff visit to ISRO Hq.
Feb 16, 2023 ISRO Quality Practices Paving the way to Reduced Mortality Rates in Hospitals Across the Country
Feb 16, 2023 Group of lunar meteorites suggest a new scenario for the origin of lunar basalts
Feb 14, 2023 US CDA Ambassador met Chairman, ISRO/ Secretary, DOS
Feb 14, 2023 ISRO participation at India Pavilion, AeroIndia-2023
Feb 08, 2023 Commencement of Recovery trials for the Gaganyaan Mission
Feb 08, 2023 Successful test of Throttleable Vikas Engine for 67% Thrust level
Feb 08, 2023 Second Developmental Flight of SSLV
Jan 26, 2023 IIA hands over VELC payload to ISRO
Jan 25, 2023 ISRO Participation at IISF
Jan 20, 2023 Rozgar Mela: 330+ Appointment Orders issued till December 2022
Jan 10, 2023 Ambassador of Costa Rica to India met Chairman, ISRO/ Secretary, DOS
Dec 30, 2022 Meeting of Space Agency Chiefs of India and Mexico
Dec 24, 2022 Successful CE-20 Engine Hot Test with 20t off-nominal & 22.2t vacuum thrust
Dec 15, 2022 Completion of third batch of UNNATI programme at URSC, ISRO
Dec 09, 2022 First blow down test of Trisonic Wind Tunnel at VSSC
Dec 09, 2022 NSSS-2022 Event inaugurated
Dec 08, 2022 EOS-06 images Cyclone Mandous and detects Algal Bloom
Dec 07, 2022 Rocket motor Produced by Industry Successfully tested
Dec 06, 2022 ISRO and Social Alpha join hands to establish SpaceTech Innovation Platform - SpIN: Focussed on Lab to Market Transition and Venture
Dec 01, 2022 Ambassador of Czech Republic to India met Chairman, ISRO/ Secretary, DOS
Nov 30, 2022 Chairman ISRO/ Secretary DOS and Bhutan Minister had a meeting at SDSC-SHAR
Nov 28, 2022 First private launchpad & mission control center established in ISRO campus at SDSC, SHAR
Nov 23, 2022 Honourable former President Shri Ram Nath Kovind witnesses the 200th successive successful launch of RH200 - the workhorse sounding rocket of ISRO
Nov 18, 2022 ISRO Completes Major Development Test of its Gaganyaan Parachute System
Nov 18, 2022 VIKRAM-S PRARAMBH Skyroot Mission Launch successfully completed
Nov 13, 2022 Chairman, ISRO inaugurated the new office of M/s Bellatrix Aerospace
Nov 11, 2022 ISRO delivered Flight Termination System (FTS) packages to Agnikul
Nov 09, 2022 Successful CE20 uprated Engine Hot Test with 21.8 T vacuum thrust
Nov 08, 2022 ISRO facilitates the hot testing of an engine developed by an Indian space startup
Nov 02, 2022 Atmospheric Re-entry of RISAT-2.
Oct 28, 2022 CE20 Cryogenic Engine for the next mission of LVM3 tested for acceptance.
Oct 23, 2022 LVM3 M2 / OneWeb India-1 Mission is completed successfully.
Oct 19, 2022 Dr. Sankarasubramanian K., ISRO, has been designated as the Principal Scientist of the Aditya-L1 mission.
Oct 10, 2022 Two days conference on "Celebrating Seven Years of AstroSat"
Oct 07, 2022 X-rays from the Moon reveal a new lunar map in sodium
Oct 07, 2022 LVM3 M2 / OneWeb India-1 Mission update
Oct 06, 2022 World Space Week (WSW) 2022 Celebrations at SDSC
Oct 03, 2022 Update on the Mars Orbiter Mission (MOM) and the National Meet organised on 27 September,2022
Sep 28, 2022 ISRO Scientist elected as the Vice President of International Astronautical Federation (IAF)
Sep 27, 2022 Inauguration of Integrated Cryogenic engine Manufacturing Facility (ICMF)
Sep 23, 2022 ISRO develops microprocessor-controlled smart limbs
Sep 20, 2022 30 kN Hybrid Motor Successfully Tested at IPRC on 20/09/2022
Sep 16, 2022 Hyderabad City Police utilised BHUVAN-based application for Ganesa procession
Sep 16, 2022 URSC/ISRO Celebrated Golden Jubilee
Sep 15, 2022 ISRO Organizes Smart India Hackathon-2022 Grand Finale
Sep 08, 2022 7th Bengaluru Space Expo - BSX-2022
Sep 06, 2022 Ambassador of Netherlands met Chairman, ISRO /Secretary, DOS Gaganyaan Low Altitude Escape Motor (LEM) Static Test
Sep 06, 2022 Australian Space Agency Chief met Chairman, ISRO/Secretary, DOS
Aug 15, 2022 Azadi Ka Amrit Mahotsav:76th Independence Day at Department of Space
Aug 10, 2022 Gaganyaan Low Altitude Escape Motor (LEM) Static Test
Aug 10, 2022 Launching of ISRO’s Virtual Space Museum “SPARK”
Aug 10, 2022 Selected Pictures - International Moon Day (Online Quiz competition held on 20/07/2022)
Aug 10, 2022 Launch of ISRO Technical Training Programme (ITTP)
Aug 09, 2022 Luxembourg Ambassador met Chairman, ISRO /Secretary, DOS
Aug 07, 2022 Statement by Chairman, ISRO
Aug 07, 2022 SSLV Update - All the stages performed normal. Both the satellites were injected. But, the orbit achieved was less than expected, which makes it unstable.
Aug 07, 2022 DFRS payload onboard Chandrayaan-2 orbiter detects high density plasma in the Lunar wake region.
Jul 30,2022 IFSCA enters into an MoU with DoS
Jul 30,2022 Industry interaction at IIC
Jul 28,2022 Ambassador of Romania met Chairman, ISRO/Secretary, DOS
Jul 28,2022 ISRO’s participation in Digital India: Catalysing New India Techade
Jul 27,2022 NESAC signs MoU with Government of Tripura
Jul 22,2022 National workshop on “Space based Information Support for Climate and Environment Studies” July 18 - 19, 2022, New Delhi
Jul 11,2022 Dedication of ISRO System for Safe & Sustainable Operations Management (IS4OM) to the nation
Jul 08,2022 TMC-2 imaged Rocket Booster Impact on the Lunar Surface
Jul 04,2022 DPIIT has launched NavIC grand challenge for startups
Jun 28,2022 Ambassador of Colombian Republic to India met Chairman, ISRO/Secretary, DOS
Jun 27,2022 ISRO offers a 3-day webinar-based free training on Bhuvan utilisation
Jun 22,2022 National Conference on "Development of Space Start-up Ecosystem in India (DeSSEI: ????)"
Jun 13,2022 ISRO - NASA Space Apps 2022 Challenge
Jun 07,2022 UNispace Nanosatellite Assembly & Training by ISRO
Jun 07,2022 Ambassador of Dominican Republic to India met Chairman, ISRO/Secretary, DOS
Jun 07,2022 Chairman, ISRO/Secretary, DOS and Head of Australian Space Agency reviewed space cooperation
Jun 01,2022 Registration open for 3rd Batch of Training programme on Nanosatellite Building
May 31,2022 GSAT-24 Satellite Mission status update
May 30,2022 Valedictory Function of YUVIKA – 2022
May 24,2022 Health-Quality Upgradation Enabled through Space Technology (Health-QUEST)
May 16,2022 Yuva Vigyani Karyakram (YUVIKA-2022)
May 12,2022 ISRO ORGANISES ACADEMIA-INSTITUTE-MINISTRY MEET FOR SPACE-BASED AERONOMY MISSION
May 07,2022 ISRO offers training programme for Bhutan Officials on satellite data processing
May 05,2022 Italian Minister of Foreign Affairs and International Cooperation visited ISRO HQ
May 05,2022 ISRO SYNERGISES NATIONAL EFFORTS TO STUDY PLANET VENUS
Apr 28,2022 Capacity Building Commission Visit to ISRO Headquarters
Apr 27,2022 ISRO and MSDE collaboration in Capacity Building of Technical Staff
Apr 26,2022 World IPR Day - 2022
Apr 01,2022 Mexican Foreign Affairs Minister met Chairman, ISRO/Secretary, DOS
Mar 31,2022 New vistas of industry partnership in the space sector - Successful realization of flight grade RF packages and Electromechanical Actuation Systems by private companies at the GOCO facility in VSSC
Mar 26,2022 EOS-04, INS-2TD and INSPIRESat-1: Update
Mar 25,2022 GSLV-F10/EOS-03 Mission Failure: Failure Analysis Committee submits conclusions & recommendations
Mar 24,2022 Space Situational Assessment 2021
Mar 16,2022 ISRO ACADEMIA DAY 2022
Mar 14,2022 Ground testing of Solid Booster Stage (SS1) for Small Satellite Launch Vehicle (SSLV)
Mar 12,2022 Satish Dhawan Centre For Space Sciences Inaugurated at CUJ,Jammu
Mar 10,2022 YUVIKA 2022 - Online Registration Announced.
Mar 08,2022 CHACE-2 Onboard Chandrayaan-2 Orbiter makes the First Observations of the Global Distribution of Argon-40 in the Exosphere of Moon
Feb 28,2022 Indian Mars Orbiter Mission (MOM) used for Investigating the Solar Corona by ISRO Scientists
Feb 23,2022 Chandrayaan-2 detected solar proton events due to high intensity solar flares in January 2022.
Feb 22,2022 Ambassador of Israel to India met Chairman,ISRO/Secretary, DOS
Feb 13,2022 PSLV-C52/EOS-04 Mission: The countdown process of 25 hours and 30 minutes leading to the launch commenced at 04:29 hours today,the February 13,2022.
Feb 07,2022 Successful post mission disposal of INSAT-4B Satellite
Jan 31,2022 Department of Space demonstrates entanglement based quantum communication over 300m free space along with real time cryptographic applications
Jan 24,2022 Announcement of Opportunity (AO) soliciting proposals for 12th AO cycle observations
Jan 20,2022 Qualification testing of VIKAS Engine for Gaganyaan Programme
Jan 14,2022 Shri. S Somanath assumes charge as Secretary,Department of Space
Jan 12,2022 Qualification testing of Cryogenic Engine for Gaganyaan Programme
Jan 03,2022 New Year Message - 2022 from Dr. K Sivan,Secretary DOS Chairman ISRO pdf icon  PDF - 3.8 MB
Dec 16,2021 NSSS 2022 - National Space Science Symposium
Dec 09,2021 ISRO and OPPO India to work towards providing NavIC messaging services in mobile platforms
Dec 08,2021 Commencement of Gaganyaan Mission Specific Crew Training
Nov 29,2021 Regional Academic Centre for Space (RAC-S) Inaugurated at NIT Patna
Nov 22,2021 ISRO Unlocks Future Space Technologies through DTDI-Technology-Conclave-2021
Nov 15,2021 Discovery of an Inflated Hot-Jupiter around a Sub-Giant Star by PRL Scientists
Nov 15,2021 Chandrayaan-2 Orbiter (CH2O) performs an evasive manoeuvre to mitigate a critically close approach with LRO
Sep 28,2021 Colombian Vice Minister for Science,Technology & Innovation met Chairman,ISRO/Secretary,DOS
Sep 24,2021 Signing of Implementing Arrangement on the Joint Development of a Small Satellite for Bhutan
Sep 22,2021 Ambassador of Belgium to India met Chairman,ISRO/Secretary, DOS
Sep 21,2021 Unlocking the Space Sector - on the path to Atmanirbhar Bharat
Sep 20,2021 Chairman, ISRO/Secretary,DOS participated in Space Economy Leaders Meeting - 2021
Sep 17,2021 Framework MoU signed with M/s Agnikul
Sep 15,2021 Inauguration of Bellatrix Aerospace laboratory
Sep 13,2021 Inauguration of International Space Conference & Exhibition
Sep 11,2021 Framework MoU signed with M/s Skyroot
Sep 09,2021 Lunar Science Workshop 2021
Sep 09,2021 Lunar Science Workshop 2021
Sep 06,2021 Meeting of Chairman,ISRO/Secretary,DOS with British High Commissioner to India
Sep 06,2021 Lunar Science Workshop and Release of Chandrayaan-2 Data
Sep 06,2021 Lunar Science Workshop and Release of Chandrayaan-2 Data
Aug 28,2021 Successful hot Test of Gaganyaan Service Module Propulsion System – System Demonstration Model (SDM)
Aug 25,2021 Secretary, DOS /Chairman,ISRO interacts with delegates from Industry, Academia & Start-ups
Aug 23,2021 Announcement of Opportunity (AO) for utilizing Chandrayaan-2 Orbiter Payloads data for scientific analysis
Aug 18,2021 BRICS Space Agencies leaders signed Agreement for cooperation in Remote sensing satellite data sharing
Aug 12,2021 GSLV-F10/EOS-03 Mission update
Aug 11,2021 GSLV-F10/EOS-03 Mission: Filling of oxidizer for the liquid strap-ons (L40) of GSLV-F10 completed
Aug 11,2021 GSLV-F10/EOS-03 Mission: Filling of oxidizer for the liquid strap-ons (L40) of GSLV-F10 commenced
Aug 11,2021 GSLV-F10/EOS-03 Mission: Filling of propellant for the liquid strap-ons (L40) of the GSLV-F10 completed
Aug 11,2021 GSLV-F10/EOS-03 Mission: Filling of propellant for the liquid strap-ons (L40) of GSLV-F10 commenced.
Aug 11,2021 GSLV-F10/EOS-03 Mission: Filling of propellant for the second stage (GS2) of GSLV-F10 completed.
Aug 11,2021 GSLV-F10/EOS-03 Mission: Filling of propellant for the second stage (GS2) of GSLV-F10 commenced.
Aug 11,2021 GSLV-F10/EOS-03 Mission: Filling of oxidizer for the second stage (GS2) of GSLV-F10 completed
Aug 11,2021 Aug 11,2021 GSLV-F10/EOS-03 Mission: Countdown for the launch of GSLV-F10/EOS-03 mission commenced today at 0343 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota.
Aug 04,2021 Secretary DOS /Chairman,ISRO Dr. K. Sivan virtually inaugurated health QUEST study in hospitals
Jul 30,2021 Chairman, ISRO/Secretary,DOS had a meeting with the new Director General of European Space Agency
Jul 29,2021 Chairman, ISRO/Secretary,DOS had a meeting with the Director General of Israel Space Agency
Jul 29,2021 ISRO Merchandise
Jul 15,2021 Chairman, ISRO/Secretary,DOS had a meeting with Ambassador of Dominican Republic
Jul 14,2021 Third Successful Vikas Engine Long Duration Hot Test for Gaganyaan Program
Jul 12,2021 Chairman, ISRO/Secretary,DOS had a meeting with the new President of French National Space Agency
Jul 02,2021 Garmin launches NavIC enabled Standalone Handheld Devices
Jun 25,2021 NavIC L1 adopts indigenous digital codes designed by ISRO and IISc
Jun 22,2021 Unraveling the mysteries of the Solar Corona: New results from Chandrayaan-2 Solar X-ray Monitor
Jun 14,2021 Natural selection in few milliseconds: Shock-induced formation of complex macroscale structures
Apr 21,2021 Webinar on “Continuously Operating Reference Stations in India – Prospects of NavIC”
Apr 20,2021 Announcement of Opportunity (AO) for Utilizing AstroSat archival data (3rd Batch)
Apr 15,2021 French Minister has visited ISRO Headquarters and HSFC on April 15, 2021
Mar 31,2021 Workshop on Scientific Writing
Mar 22,2021 ISRO makes breakthrough demonstration of free-space Quantum Key Distribution (QKD) over 300 m
Mar 18,2021 Dr. K. Sivan,Chairman,ISRO /Secretary,DOS inaugurates 3 Space Technology Incubation Centres and releases YUKTI-Sanchita 2021
Mar 17,2021 Dr. K. Sivan,Chairman,ISRO/Secretary,DOS had a meeting with HRH Prince Sultan bin Salman bin Abdul Aziz,Chairman of the Board of Directors of Saudi Space Commission
Mar 11,2021 Dr. K. Sivan,Chairman,ISRO/Secretary,DOS had a meeting with the President of Japan Aerospace Exploration Agency
Mar 08,2021 ISRO’s NISAR payload flagged off to JPL,NASA
Mar 03,2021 Dr. K. Sivan,Chairman,ISRO/Secretary,DOS had a meeting with the President of Italian Space Agency
Feb 28,2021 Brazilian Minister visited ISRO to witness the launch of Amazonia-1 satellite
Feb 27,2021 PSLV-C51/Amazonia-1 Mission: Filling of oxidizer for the second stage(PS2) of PSLV-C51 completed
Feb 27,2021 PSLV-C51/Amazonia-1 Mission: Filling of oxidizer for the second stage(PS2) of PSLV-C51 commenced
Feb 27,2021 PSLV-C51/Amazonia-1 Mission: Filling of oxidizer for the fourth stage(PS4) of PSLV-C51 completed
Feb 27,2021 PSLV-C51/Amazonia-1 Mission: Filling of fuel for the fourth stage(PS4) of PSLV-C51 commenced.
Feb 27,2021 PSLV-C51/Amazonia-1 Mission: Countdown for the launch of PSLV-C51/Amazonia-1 mission commenced today at 0854Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR,Sriharikota.
Feb 25,2021 PSLV-C51/Amazonia-1 Mission: Launch Rehearsal completed
Feb 23,2021 Announcement of Opportunity (AO) soliciting proposals for Eleventh AO cycle observations
Feb 17,2021 Dr. K. Sivan,Chairman,ISRO/Secretary,DOS had a meeting with the new Head of Australian Space Agency and signed an amendment to the existing India – Australia MoU for space cooperation
Feb 11,2021 MoU signed with M/s CE Info Systems Pvt Ltd. (MapmyIndia)
Feb 02,2021 Non-Disclosure Agreement signed with M/s Skyroot
Feb 02,2021 Workshop on Incubators/Accelerators for a dynamic space start-up ecosystem
Jan 28,2021 UNITYsat Ground stations inaugurated by Secretary/DOS, Chairman, '/ISRO
Jan 22,2021 DOS signed MOU with Space Kidz India,Chennai for testing Satish Dhawan Sat at URSC
Jan 22,2021 DOS signed MOU with Consortium of Jeppiaar Institute of Technology, Chennai,GH Raisoni College of Engineering,Nagpur and Sri Shakthi Institute of Engineering & Technology, Coimbatore for testing UNITYsat at URSC
Jan 20,2021 Inauguration of M/s Pixxel's office at Bangalore held today in the presence of Dr. K. Sivan,Chairman,ISRO/Secretary,DOS as Chief Guest
Jan 19,2021 Bhutan Engineers met Dr. K. Sivan,Chairman,ISRO/Secretary, DOS
Jan 15,2021 Announcement of Opportunity for Space theme based Merchandize
Jan 12,2021 Atal Tinkering Lab (ATL) Adoption by ISRO
Jan 01,2021 New Year Message from IN-SPACe
Jan 01,2021 SECRETARY, DOS /CHAIRMAN,ISRO’S NEW YEAR MESSAGE FOR 2021 “Laying a firm foundation for the next decade”
Dec 24,2020 Chandrayaan-2 Mission : Initial data release
Dec 23,2020 ISRO Signed MoU with IIT (BHU),Varanasi
Dec 21,2020 CMS-01 Update
Dec 17,2020 PSLV-C50/CMS-01 Mission: Filling of fuel and oxidizer for the second stage (PS2) of PSLV-C50 completed.
Dec 16,2020 PSLV-C50/CMS-01 Mission: Filling of fuel for the fourth stage(PS4) of PSLV-C50 Completed.
Dec 16,2020 PSLV-C50/CMS-01 Mission: Filling of fuel for the fourth stage(PS4) of PSLV-C50 commenced.
Dec 16,2020 PSLV-C50/CMS-01 Mission: Countdown for the launch of PSLV-C50/CMS-01 mission commenced today at 1441 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR,Sriharikota.
Dec 16,2020 ISRO SSAControl Centre Inaugurated by Dr. K. Sivan, Chairman, ISRO/Secretary,DOS
Dec 14,2020 PM interacts with space industries and start-ups
Dec 11,2020 PSLV-C50 is scheduled to launch CMS-01 on December 17,2020 from Satish Dhawan Space Centre SHAR
Dec 08,2020 INTERNATIONAL MARITIME ORGANISATION (IMO) RECOGNITION FOR IRNSS/NavIC
Dec 03,2020 Non-Disclosure Agreement signed with M/s Agnikul
Nov 16,2020 S200 Motor case for Gaganyaan first Unmanned Mission Flagged Off
Nov 07,2020 PSLV-C49/EOS-01 Mission:Filling of fuel for the second stage(PS2) of PSLV-C49 completed
Nov 06,2020 PSLV-C49/EOS-01: Filling of oxidizer for the fourth stage(PS4) of PSLV-C49 completed.
Nov 06,2020 PSLV-C49/EOS-01: Filling of fuel for the fourth stage(PS4) of PSLV-C49 completed.
Nov 06,2020 PSLV-C49/EOS-01 Mission: Filling of fuel for the fourth stage(PS4) of PSLV-C49 commenced.
Nov 06,2020 PSLV-C49/EOS-01 Mission: The countdown for the launch of PSLV-C49/EOS-01 mission commenced today at 1302 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR,Sriharikota. The launch is scheduled at 1502 Hrs IST on November 07,2020
Nov 05,2020 MOM – MENCA Data from 24th Sep 2017 to 23rd Sep 2019 is released
Oct 19,2020 Technology Transfer MoU signed between DOS and NSIL
Oct 05,2020 Prof. Satish Dhawan Birth Centenary Programme at ISRO HQ
Oct 02,2020 Commemoration of 150th Birth Anniversary of Mahatma Gandhiji
Sep 29,2020 Valedictory function of Vikram Sarabhai Centenary Programme
Sep 29,2020 Dr B N Suresh and Dr. K Sivan awarded the prestigious IEEE Simon Ramo Medal
Sep 28,2020 Harnessing the potential of Remote Sensing Data
Sep 21,2020 Valedictory Function of Dr. Vikram Sarabhai Centenary Programme
Sep 16,2020 Rajbhasha Kirti Puraskar(2019-2020)
Sep 11,2020 International Space Conference on Ushering the New Era for Indian Space Sector
Sep 11,2020 Virtual Conference on Unlocking India potential in space sector
Sep 10,2020 Empowering India's Startups to transform Space Sector with ISRO and AIM
Sep 09,2020 Webinar on Empowering India's Startups to transform Space Sector scheduled on September 10,2020 @ 1400 hrs
Sep 08,2020 70th Year adoption of the Constitution of India
Aug 27,2020 India's AstroSat discovers one of the earliest galaxies in extreme-Ultraviolet light and marks a major breakthrough
Aug 26,2020 YUVIKA 2020 Cancelled
Aug 20,2020 Chandrayaan-2 completes a year around the Moon
Aug 19,2020 Link to watch live streaming of Webinar on Unlocking of India’s Potential in Space Sector
Aug 19,2020 Live Streaming of Webinar on "Unlocking India's Potential in Space Sector"
Aug 14,2020 WEBINAR - Unlocking of India’s Potential in Space Sector
Aug 12,2020 Chandrayaan-2 imaged Sarabhai crater on the Moon
Aug 04,2020 VIKRAM SARABHAI CENTENARY VALEDICTORY and YUVIKA POSTPONEMENT
Jul 29,2020 UNLOCKING INDIA’S POTENTIAL IN SPACE SECTOR
Jul 29,2020 Indian National Space Promotion and Authorization Center (IN-SPACe)
Jul 21,2020 First anniversary of Chandrayaan-2 launch
Jul 17,2020 Webinar on "Unlocking the Space Sector" rescheduled on July 21 2020 is further postponed
Jul 08,2020 Webinar on "Unlocking the Space Sector" postponed
Jul 04,2020 Promotion of Space Activities
Jul 04,2020 Webinar on “Unlocking the Space Sector”
Jul 03,2020 Phobos imaged by MOM on 1st July
Jun 25,2020 Briefing by Secretary,DOS/Chairman,ISRO
Jun 19,2020 6th International Yoga Day
Jun 09,2020 ISRO Announces ICC-2020. Registration Open.
Jun 05,2020 UNNATI - Batch 3 Information
May 26,2020 Announcement of Opportunity (AO) soliciting proposals for Tenth AO cycle observations
Apr 20,2020 YUVIKA 2020 Postponed
Apr 17,2020 Announcement of Opportunity (AO) - Development of Technologies for sustained Indian Human Space Programand Space Exploration
Mar 10,2020 YUVIKA 2020 - Provisional Selection List Announced
Feb 24,2020 German Parliamentary delegation met Dr. K. Sivan Chairman, ISRO/Secretary,DOS
Feb 20,2020 Public Notice
Jan 28,2020 National Workshop on " Space-based Information Support for Decentralised Planning-2"
Jan 24,2020 IAA-ISRO-ASI Symposium on Human Space Flight and Exploration was organised at Bangalore
Jan 21,2020 Launch of mobile chipset compatible to NavIC
Jan 20,2020 GSAT-30 update
Jan 10,2020 Fourth Lunar Science Meet and Chandrayaan-2 Data Analysis Workshop held at ISSDC,Bengaluru
Jan 10,2020 High Resolution Images observed from CARTOSAT-3
Dec 31,2019 Vikram Sarabhai Journalism Award in Space Science,Technology and Research
Dec 16,2019 Onboard Camera View of Radial Rib Antenna deployment in RISAT-2BR1
Dec 12,2019 Radial Rib Antenna of RISAT-2BR1 deployed successfully
Dec 11,2019 PSLV-C48/RISAT-2BR1: Filling of propellant for the second stage(PS2) of PSLV-C48 completed.
Dec 11,2019 PSLV-C48/RISAT-2BR1:Filling of fuel for the second stage(PS2) of PSLV-C48 commenced.
Dec 10,2019 PSLV-C48/RISAT-2BR1: Filling of oxidizer for the fourth stage(PS4) of PSLV-C48 completed
Dec 10,2019 PSLV-C48/RISAT-2BR1: Filling of fuel for the fourth stage(PS4) of PSLV-C48 completed
Dec 10,2019 PSLV-C48/RISAT-2BR1 Mission: The countdown for the launch of PSLV-C48/RISAT-2BR1 mission commenced today at 1640 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR,Sriharikota. The launch is scheduled at 1525 Hrs IST on December 11,2019
Dec 05,2019 PSLV-C48/RISAT-2BR1 Mission - Online registration for viewers gallery
Nov 27,2019 PSLV-C47 Mission - Propellant Filling of second stage (PS2) of PSLV-C47 Completed.
Nov 27,2019 PSLV-C47 Mission - Propellant filling for the second stage (PS2) of PSLV-C47 commenced
Nov 26,2019 PSLV-C47 Mission - Propellant filling of fourth stage of PSLV-C47 completed
Nov 26,2019 The 26 hours countdown for the launch of PSLV-C47 mission commenced today at 0728 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR,Sriharikota. The launch is scheduled at 0928 Hrs IST on November 27,2019
Nov 22,2019 7th meeting of India-USA CSJWG was organised at ISRO Headquarters, Bangalore
Nov 21,2019 PSLV-C47/Cartosat-3 Mission - Online registration for viewers gallery
Nov 21,2019 The launch of PSLV-C47 carrying Cartosat-3 scheduled on November 2019 at 0928 hrs is rescheduled to launch on November 27, at 0928 hrs from Second launch pad of Satish Dhawan Space Centre SHAR,Sriharikota.
Nov 13,2019 Topographic Mapping Using TMC-2 of Chandrayaan-2: Initial Results
Oct 31,2019 Detection of Argon-40 in the lunar exosphere
Oct 31,2019 Director General Kuwait Institute for Scientific Research visited ISRO
Oct 24,2019 Chandrayaan-2 Data Users Meet held at New Delhi
Oct 22,2019 Initial imaging and observations by Chandrayaan-2 Dual-Frequency Synthetic Aperture Radar (DF-SAR)
Oct 17,2019 Chandrayaan-2 begins spectroscopic studies of lunar surface
Oct 15,2019 UNNATI BATCH 2 Inaugurated
Oct 14,2019 Mars Orbiter Mission (MOM) – List of Publications - September 2019
Oct 14,2019 NavIC support in upcoming Mobile,Automotive and IoT Platforms is poised to deliver superior Location-Based services to India's Industries and Technology Ecosystem Through Qualcomm
Oct 11,2019 Release of fourth year data of Mars Orbiter Mission
Oct 10,2019 Solar flare observed by the Solar X-ray Monitor on Chandrayaan-2
Oct 04,2019 Chandrayaan2 - Images from the Orbiter High Resolution Camera
Oct 04,2019 US Secretary of Commerce visited ISRO
Oct 03,2019 Studying Earth’s extended magnetosphere (geotail)plasma around Moon
Sep 23,2019 Thailand Ambassador visited ISRO
Sep 23,2019 President of Mongolia visited ISRO
Sep 19,2019 AstroSat: Announcement of Opportunity (AO) soliciting proposals for Ninth AO cycle observations
Sep 19,2019 Update on Chandrayaan – 2
Sep 19,2019 ISRO-Space Technology Cell Confluence held at IIT Madras
Sep 16,2019 Rajbhasha Kirti Purashkar (First) 2018-19
Sep 11,2019 CalTech’s Provost met Chairman,ISRO/Secretary,DOS
Sep 10,2019 Chandrayaan 2: Vikram lander has been located by the orbiter
Sep 09,2019 Regarding Social Media Accounts in the name of Kailasavadivoo Sivan, Chairman ISRO
Sep 07,2019 Chandrayaan - 2 Latest Update
Sep 07,2019 Chandrayaan 2 - Update
Sep 06,2019 Chandrayaan 2 - About Pragya Rover
Sep 06,2019 Chandrayaan 2 Mission - About Vikram Lander
Sep 04,2019 Chandrayaan-2 update: Second de-orbiting maneuver
Sep 03,2019 Chandrayaan-2 update: First de-orbiting maneuver
Sep 02,2019 Live media coverage of the landing of Chandrayaan-2 on lunar surface
Sep 02,2019 Chandrayaan-2 update: Vikram Lander successfully separates from Orbiter
Sep 01,2019 Chandrayaan-2 update: Fifth Lunar Orbit Maneuver
Aug 30,2019 Chandrayaan-2 update: Fourth Lunar Orbit Maneuver
Aug 28,2019 Chandrayaan-2 update: Third Lunar bound Orbit Maneuver
Aug 26,2019 Images of Lunar Surface captured by Terrain Mapping Camera -2 (TMC-2)of Chandrayaan 2
Aug 23,2019 Bharat Ratna Dr. A P J Abdul Kalam Award for Dr K Sivan
Aug 22,2019 Moon as viewed by Chandrayaan-2 LI4 Camera on 21 August 2019 19:03 UT
Aug 21,2019 Chandrayaan-2 update: Second Lunar Orbit Maneuver
Aug 20,2019 Chandrayaan-2 update: Lunar Orbit Insertion
Aug 19,2019 Ambassador of the Argentine Republic met Dr. K. Sivan Chairman, ISRO/Secretary,DOS
Aug 19,2019 ISRO Press Meet on the occasion of Lunar Orbit Insertion of Chandrayaan-2 Mission
Aug 15,2019 73rd Independence day celebration at Anthariksh Bhavan, ISRO HQ, Bengaluru
Aug 12,2019 Inaugural Function of Vikram A Sarabhai Centenary Programme Held
Aug 08,2019 Space Museum opened at Hyderabad with ISRO Collaboration
Aug 08,2019 IAA Subsidiary Office Opened
Aug 08,2019 Contract for IAA/ISRO/ASI Symposium on HSP signed
Aug 07,2019 VIKRAM SARABHAI CENTENARY PROGRAMME
Aug 06,2019 Chandrayaan2 update: Fifth earth bound maneuver
Aug 03,2019 Online space Quiz
Aug 03,2019 Foundation stone of Space Situational Awareness Control Centre by Chairman, ISRO
Aug 02,2019 Chandrayaan2 update: Fourth earth bound maneuver
Jul 29,2019 Chandrayaan2 update: Third earth bound maneuver
Jul 29,2019 Mr. Jean Yves Le Gall,President,French National Space Agency (CNES) met Dr. K. Sivan,Chairman
Jul 26,2019 Chandrayaan2 update: Second earth bound maneuver
Jul 25,2019 Ambassador of the Grand Duchy of Luxembourg met Dr. K. Sivan
Jul 24,2019 Chandrayaan2 update: First earth bound maneuver
Jul 24,2019 Chandrayaan – 2 update : Optimised Mission Plan of Chandrayaan – 2 Spacecraft
Jul 23,2019 Vikram Sarabhai Journalism Award in Space Science,Technology and Research
Jul 22,2019 Honorable Prime Minister Congratulates Team ISRO for the successful launch of Chandrayaan-2
Jul 22,2019 GSLV MkIII-M1/Chandrayaan 2: Filling of Liquid Hydrogen in cryogenic stage(C25) of GSLV MkIII-M1 Completed
Jul 22,2019 GSLV MkIII-M1/Chandrayaan2: Filling of Liquid Oxygen in cryogenic stage(C25) of GSLV MkIII-M1 Completed
Jul 22,2019 GSLV MkIII-M1/Chandrayaan 2: Filling of liquid Hydrogen in Cryogenic stage(C25) of GSLV MkIII-M1 commenced.
Jul 22,2019 GSLV MkIII-M1/Chandrayaan 2: Filling of liquid oxygen in Cryogenic stage(C25) of GSLV MkIII-M1 commenced.
Jul 22,2019 GSLV MkIII-M1/Chandrayaan-2: Filling of N204 for the Liquid core stage (L110) of GSLV MkIII-M1 completed today(22-07-2019) at 0240 hrs IST
Jul 22,2019 GSLV MkIII-M1/Chandrayaan-2: Filling of N204 for the Liquid core stage (L110) of GSLV MkIII-M1 commenced
Jul 21,2019 GSLV MkIII-M1/Chandrayaan-2: UH25 (fuel) filling of liquid core stage (L110) of GSLV MkIII-M1 completed
Jul 21,2019 GSLV MkIII-M1/Chandrayaan-2: UH25 (fuel) filling of liquid core stage (L110) of GSLV MkIII-M1 commenced
Jul 21,2019 The launch countdown of GSLV MkIII-M1/Chandrayaan-2 commenced today at 1843 Hrs IST. The launch is scheduled at 1443 Hrs IST on July 22,2019.
Jul 20,2019 GSLV MkIII-M1/Chandrayaan-2 - Update: Launch rehearsal completed, performance normal
Jul 18,2019 GSLV MkIII-M1/Chandrayaan 2 - Online registration for viewers gallery
Jul 18,2019 CHANDRAYAAN -2 LAUNCH RESCHEDULED ON 22ND JULY,2019,AT 14:43 HRS
Jul 15,2019 A technical snag was observed in launch vehicle system at one hour before the launch. As a measure of abundant precaution Chandrayaan-2 launch has been called off for today. Revised launch date will be announced later
Jul 15,2019 GSLV MkIII-M1/Chandrayaan 2: Filling of liquid oxygen in Cryogenic stage of GSLV MkIII-M1 completed
Jul 15,2019 GSLV MkIII-M1/Chandrayaan-2: Filling of liquid oxygen in Cryogenic stage completed and filling up of liquid hydrogen commenced
Jul 14,2019 GSLV MkIII-M1/Chandrayaan 2: Filling of liquid oxygen in Cryogenic stage commenced.
Jul 14,2019 GSLV MkIII-M1/Chandrayaan-2: Propellant filling of liquid core stage (L110) of GSLV MkIII-M1 completed
Jul 14,2019 GSLV MkIII-M1/Chandrayaan-2: UH25 (fuel) filling of liquid core stage (L110) of GSLV MkIII-M1 completed
Jul 14,2019 GSLV MkIII-M1/Chandrayaan-2: Propellant filling of Liquid stage (L110) of GSLV MkIII-M1 is in progress
Jul 14,2019 The launch countdown of GSLV MkIII-M1/Chandrayaan-2 commenced today at 0651 Hrs IST. The launch is scheduled at 0251Hrs IST on July 15th.
Jul 12,2019 GSLV MkIII-M1/Chandrayaan 2 Update
Jul 11,2019 GSLV MkIII-M1/Chandrayaan 2 Update
Jul 10,2019 GSLV MkIII-M1/Chandrayaan 2 Update
Jul 09,2019 GSLV MkIII-M1/Chandrayaan-2: Routing and termination of pyros, pressure sensors,Umbilical Connection Unit(UCU) separation connector cables end to end checks completed.
Jul 08,2019 GSLV MkIII-M1/Chandrayaan2 update: Full Dress Rehearsal-1 (FDR-1) in progress.
Jul 07,2019 GSLV MkIII-M1/Chandrayaan-2 update
Jul 06,2019 GSLV MkIII-M1/Chandrayaan-2: Launch vehicle ready for movement to launch pad.
Jul 05,2019 GSLV MkIII-M1/Chandrayaan-2 update
Jul 04,2019 GSLV MkIII-M1/Chandrayaan-2: Integration of encapsulated assembly of Chandrayaan-2 with launch vehicle completed.
Jul 04,2019 GSLV MkIII-M1/Chandrayaan-2: Online registration process for witnessing the forthcoming GSLV MKIII-M1 /Chandrayaan-2 mission commenced @ 00:00 hrs on 04th July 2019
Jul 02,2019 GSLV MkIII-M1/Chandrayaan-2 Update
Jul 01,2019 Chandrayaan -2 getting ready for integration with GSLV launcher.
Jun 30,2019 GSLV MkIII-M1/Chandrayaan-2 - Update
Jun 29,2019 GSLV MkIII-M1/Chandryaan-2: Vikram lander (assembled with Pragyan Rover) integrated with Orbiter.
Jun 29,2019 GSLV MkIII-M1/Chandrayaan 2: Rover after completion of all tests integrated with lander Vikram
Jun 28,2019 GSLV MkIII-M1/Chandrayaan 2: Assembly of the batteries for all stages of launch vehicle completed
Jun 18,2019 Chandrayaan2 - From Pole to Pole
Jun 18,2019 Second Lunar Science Meet at ISRO HQ
Jun 17,2019 Announcement of Opportunity (AO) for Sounding Rockets
Jun 15,2019 Announcement of Opportunity (AO) for Orbital Platform
Jun 15,2019 French Ambassador met Chairman,ISRO/Secretary,DOS
Jun 08,2019 ISRO successfully tested CE-20 engine,meant for the upper stage of GSLV MK-III. The engine is planned to be used in human rated GSLV MK-III launch vehicle (Gaganyaan Mission)
Jun 03,2019 The challenges of a Moon landing
Jun 01,2019 Setting up of Space Technology Incubation Centre at NIT- Tiruchirappalli
May 31,2019 Online registration for Second batch of UNNATI commences from June 01,2019 to July 15,2019
May 30,2019 Young Scientist Programme (Yuvika-2019) concluded
May 30,2019 Space Technology Cell (STC) Inaugurated at IIT Guwahati, Guwahati
May 29,2019 MoU signed between ISRO and IAF for cooperation in crew selection and training for Gaganyaan Project
May 21,2019 Propellant filling for the second stage (PS2) of PSLV-C46 commenced
May 21,2019 Propellant filling of fourth stage(PS4) of PSLV-C46 completed
May 21,2019 The countdown for the launch of PSLV-C46 mission commenced today at 04:30 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota. The launch is scheduled at 05:30 Hrs IST on May 22, 2019
May 17,2019 Yuvika Samwad - 2019
May 16,2019 Registration for viewer's gallery at SDSC Sriharikota for PSLV 46 launch. The Launch is at 0530 hrs on 22nd May 2019
May 15,2019 Benefits of Chandrayaan-2
May 14,2019 Chandrayaan - 2 Update
May 11,2019 PSLV-C46 mission on 22nd May 2019 from Satish Dhawan Space Centre SHAR
Apr 30,2019 Dr. K. Sivan,Secretary,DOS /Chairman,ISRO felicitated with the Vigyan Ratna Award
Apr 12,2019 Yuvika 2019 - final list of selected candidates for YUVIKA program
Apr 04,2019 Launch view gallery in SDSC SHAR,Sriharikota was inaugurated by Dr. K. Sivan,Secretary,DOS/Chairman,ISRO on 31st March, 2019
Apr 03,2019 Announcement of Opportunity for "Space-National Academic Partner (S-NAP)" - Deadline for submission of proposals extended to April 30, 2019
Apr 03,2019 AstroSat Picture of the Month of March,2019
Apr 01,2019 PSLV-C45 Mission - Propellant filling of second stage completed
Mar 31,2019 PSLV-C45 Mission - Propellant filling of second stage of PSLV-C45 commenced
Mar 31,2019 PSLV-C45 Mission - Propellant filling of fourth stage of PSLV-C45 completed
Mar 31,2019 PSLV-C45 Mission - Filling of propellant for the fourth stage (PS4) Commenced.
Mar 31,2019 The countdown for the launch of PSLV-C45 mission commenced today at 06:27 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota. The launch is scheduled at 09:27 Hrs IST on 1st April 2019
Mar 28,2019 Launch View Gallery
Mar 28,2019 Upcoming NavIC (IRNSS) System Week Number (WN) Rollover Event
Mar 28,2019 The PSLV-C45 vehicle was moved from the Vehicle Assembly Building to the Umbilical Tower today at 06:00 Hrs (IST) in Satish Dhawan Space Centre (SDSC) SHAR,Sriharikota. Presently, all the electrical checks are being performed.
Mar 26,2019 Young Scientist Programme (Yuvika ) - Online Registration
Mar 22,2019 Appreciation from participants of UNNATI Program
Mar 08,2019 Astrosat Picture of the Month of Feb,2019
Mar 07,2019 Mr. Jean Yves Le Gall,President,French National Space Agency (CNES) visited ISRO Head Quarters on March 6, 2019
Mar 06,2019 Announcement of Opportunity (AO) soliciting proposals for Seventh AO cycle observations
Mar 06,2019 Announcement of Opportunity for Space-National Academic Partner (S-NAP)
Feb 22,2019 Chairman,Ukrainian Space Agency’s visit to ISRO HQ
Feb 22,2019 Russian Ambassador to India visited ISRO HQ & HSFC
Feb 22,2019 British High Commissioner to India visited ISRO HQ
Feb 22,2019 JSC "Rosoboronexport" officials visited ISRO HQ
Feb 13,2019 Announcement of Opportunity (AO) for Establishing ISRO Chair at Institutes - Last date for submissions extended upto March 08, 2019
Feb 09,2019 After the injection of GSAT-31 communication satellite into an elliptical Geosynchronous Transfer Orbit (GTO) on February 06, 2019,all the three orbit raising manoeuvers have been completed successfully as planned using the satellite's propulsion system.
Feb 07,2019 The first orbit raising manoeuver of GSAT-31 satellite has been successfully carried out today (February 7,2019) at 0438 hrs (IST) by firing the Liquid Apogee Motor (LAM) engine of the satellite for a duration of 4684 seconds.
Jan 31,2019 AstroSat Picture of the Month of Jan,2019
Jan 30,2019 Inauguration of Human Space Flight Centre (HSFC)
Jan 30,2019 National Space Science Syposium (NSSS) – 2019
Jan 29,2019 Ref. Request for Qualification (RFQ) - Technology Transfer of Lithium-ion Cell by ISRO to Indian Industries
Jan 24,2019 Samwad with Students at Sriharikota
Jan 24,2019 PSLV-C44 Mission - Filling of propellant UH25 for the second stage (PS2) of PSLV-C44 completed
Jan 24,2019 PSLV-C44 Mission - Filling of propellant UH25 for second stage (PS2) of PSLV-C44 commenced.
Jan 24,2019 PSLV-C44 Mission - Filling of oxidizer (N204) for the second stage (PS2) completed
Jan 24,2019 PSLV-C44 Mission - Propellants filling of fourth stage (PS4) of PSLV-C44 completed
Jan 23,2019 The countdown for the launch of PSLV-C44 mission started today at 19:37 Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota. The launch is scheduled at 23:37 Hrs IST on 24th January 2019
Jan 17,2019 Inauguration of Space Technology Incubation Centre,National Institute of Technology,Jalandhar,Punjab
Jan 16,2019 Announcement of Opportunity (AO) for Establishing ISRO Chair at Institutes
Jan 11,2019 Press Meet - Briefing by Dr. K Sivan,Chairman,ISRO
Jan 11,2019 PSLV Productionisation
Jan 01,2019 Message from Chairman's desk
Dec 24,2018 Latest update on GSAT-7A
Dec 20,2018 The first orbit raising manoeuver of GSAT-7A satellite has been successfully carried out today (20th December) by firing the Liquid Apogee Motor (LAM) engine of the satellite at 0916 Hrs IST for a duration of 3895 seconds.
Dec 19,2018 Filling of propellant for Cryo stage (C15) of GSLV-F11/GSAT-7A mission completed
Dec 19,2018 GSAT-7A Spacecraft powered on
Dec 19,2018 Filling of propellant for Cryo stage (C15) of GSLV-F11/GSAT-7A mission commenced
Dec 19,2018 GSLV-F11/GSAT-7A Mission - Propellant filling of liquid strap-on (L40) completed
Dec 18,2018 GSLV-F11/GSAT-7A Mission - Propellant filling of liquid strap-on (L40) commenced
Dec 18,2018 GSLV-F11/GSAT-7A Mission - Second stage (GS2) propellant loading completed
Dec 18,2018 GSLV-F11/GSAT-7A Mission - Second stage (GS2) propellant loading commenced
Dec 18,2018 The countdown for the launch of GSLV-F11/GSAT-7A mission started today at 14:10 Hrs IST from Satish Dhawan Space Centre (SDSC) SHAR,Sriharikota. The launch is scheduled at 16:10 Hrs IST on 19th December 2018
Dec 10,2018 GSAT-11 positioned in Geostationary Orbit
Dec 08,2018 Orbit raising manoeuvres have been performed on GSAT-11
Dec 07,2018 Glimpse of HyperSpectral Data Captured by HySIS
Dec 04,2018 The countdown for the launch of GSAT-11 mission onboard Ariane-5 launch vehicle started today (December 04,2018) at 13:14 Hrs IST from French Guiana. The launch is scheduled at 02:07 Hrs IST on December 05,2018
Dec 02,2018 HYsIS First day Image
Nov 30,2018 AstroSat Picture of the Month Nov,2018
Nov 28,2018 PSLV-C43/HysIS Mission: Propellant filling for the second stage(PS2) of PSLV-C43 completed
Nov 28,2018 PSLV-C43/HysIS Mission: Filling of oxidizer (N204) for the second stage (PS2) of PSLV-C43 completed
Nov 28,2018 PSLV-C43/HysIS Mission: Propellant filling for the second stage(PS2) of PSLV-C43 commenced
Nov 28,2018 Celebrations of 1000th Casting Completion by SPROB
Nov 28,2018 PSLV-C43 /HysIS Mission: Fuel filling of PS4 stage (fourth stage) completed
Nov 28,2018 The countdown for the launch of PSLV-C43/HysIS mission started today at 05:58 Hrs IST from Satish Dhawan Space Centre (SDSC) SHAR,Sriharikota. The launch is scheduled at 09:58 Hrs IST on 29th November 2018
Nov 27,2018 PSLV-C43 lift off time is rescheduled to 09.58 Hrs IST on 29th November,2018. Countdown will commence from 05.58 Hrs IST on 28th November,2018
Nov 27,2018 The countdown for the launch of PSLV-C43 /HysIS Mission from Satish Dhawan Space Centre SHAR,Sriharikota is tentatively scheduled at 0557 Hrs IST on November 28,2018. The launch is tentatively scheduled at 0957 Hrs IST on November 29,2018.
Nov 17,2018 The third and final orbit raising operation of GSAT-29 satellite has been successfully carried out today (November 17, 2018) by firing the Liquid Apogee Motor (LAM) engine of the satellite at 0957 Hrs IST for a duration of 207 sec
Nov 16,2018 GSLV Mk III-D2/GSAT-29 Mission: The second orbit raising operation of GSAT-29 satellite has been successfully carried out today (November 16,2018) by firing the Liquid Apogee Motor (LAM) engine of the satellite at 1027 Hrs IST for a duration of 4988 sec
Nov 15,2018 GSLV Mk III-D2 /GSAT-29 Mission: The first orbit raising operation of GSAT-29 satellite has been successfully carried out today (15th November) by firing the Liquid Apogee Motor (LAM) engine of the satellite at 0834 Hrs IST for a duration of 4875 seconds
Nov 14,2018 GSLV Mk III-D2 /GSAT-29 Mission Launch: Filling of Liquid Oxygen in Cryogenic Stage completed and filling up of Liquid Hydrogen is in progress.
Nov 14,2018 GSLV Mk III-D2 /GSAT-29 Mission Launch - GSAT-29 satellite powered on. It is a multi-band multi-band high throughout communication satellite. It is the 33rd communication satellite built by ISRO
Nov 14,2018 GSLV Mk III-D2 /GSAT-29 Mission Launch - Filling of liquid oxygen in Cryogenic Stage commenced. Cryogenic Stage of GSLV Mklll is one of the powerful Cryogenic Upper Stages developed in the world and it generates nearly 2MW power
Nov 14,2018 GSLV Mk III-D2 /GSAT-29 Mission Launch - Launch Vehicle Avionics health checks completed
Nov 13,2018 Announcement of Opportunity (AO) for Utilization of Astrosat Archival Data
Nov 13,2018 Shri A. S. Kiran Kumar is presented with International Von Karman Wings Award
Nov 13,2018 The countdown for the launch of GSLV Mk III-D2 /GSAT-29 Mission from Satish Dhawan Space Centre SHAR,Sriharikota started today at 14:50 Hrs IST. The launch is scheduled at 17:08 Hrs IST on 14th November 2018.
Nov 07,2018 GALCIT honour for Prof. Satish Dhawan
Nov 07,2018 Announcement of Opportunity (AO) for Low Earth Orbit based Microgravity Experiments
Nov 06,2018 Announcement of Opportunity (AO) to international science community for Space-Based Experiments to Study Venus
Oct 31,2018 AstroSat Picture of the month - Oct 2018
Oct 26,2018 CHANDRAYAAN-2 LANDER ACTUATOR PERFORMANCE TEST (LAPT PHASE-2)
Oct 23,2018 Release of three publications on Indian Space Programme
Oct 13,2018 Megha-Tropiques Successfully Completes Seven Years in Orbit
Oct 12,2018 ISRO successfully tests Cryogenic Engine (CE-20) for GSLV Mk-III /Chandrayaan-2 Mission
Oct 01,2018 AstroSat Picture of the Month: Sept 2018
Sep 30,2018 Dr. K Sivan at Bremen,Germany
Sep 28,2018 Three years of AstroSat
Sep 27,2018 Lunar Science Meeting at ISRO HQ
Sep 26,2018 Archival Data of AstroSat released
Sep 26,2018 Third year data of MOM released
Sep 24,2018 Mars Orbiter Mission (MOM) completes 4 years in its orbit
Sep 19,2018 Visit of Chairman of Algerian Space Agency Governing Body & Director General of Algerian Space Agency (ASAL) to ISRO
Sep 18,2018 ISRO Conferred with Rajbhasha Kirti Award 2018
Sep 18,2018 Inauguration of Space Technology Incubation Centre,National Institute of Technology,Agartala,Tripura
Sep 16,2018 Launch at a glance
Sep 16,2018 Inauguration of S-band Polarimetric Doppler Weather Radar at SDSC SHAR by Chairman ISRO
Sep 15,2018 The countdown begun today at 01:08 pm (IST) for the launch of PSLV C42 from Satish Dhawan Space Centre,Sriharikota. The scheduled launch is at 10:08 pm (IST) tomorrow.
Sep 15,2018 The countdown begun today at 01:08 pm (IST) for the launch of PSLV C42 from Satish Dhawan Space Centre,Sriharikota. The scheduled launch is at 10:08 pm (IST) tomorrow.
Sep 13,2018 PSLV-C42 Mission Launch is scheduled on September 16, 2018
Sep 06,2018 Creating Dynamism in Indian Space Ecosystem
Aug 30,2018 AstroSat Picture of the Month Aug,2018
Aug 16,2018 72nd Independence Day Celebrations at ISRO HQ
Aug 12,2018 Dr.Vikram A Sarabhai Birth Anniversary
Aug 10,2018 6th Bangalore Space Expo 2018,6-8 September 2018
Aug 06,2018 Transfer of VSSC developed Lithium Ion Cell Technology to Industries
Jul 30,2018 ASTROSAT PICTURE OF THE MONTH (APOM) – JULY 2018
Jul 21,2018 MOU between ISRO and EIL
Jul 15,2018 Successful Qualification of High Thrust Vikas Engine
Jul 02,2018 AstroSat Picture of the Month (June 2018)
Jun 12,2018 Li Ion Technology Transfer
May 28,2018 AstroSat Picture of the Month (May 2018)
Apr 30,2018 AstroSat Picture of the Month (April 2018)
Apr 25,2018 Shri A S Kiran Kumar selected to receive "International von Karman Wings Award" for the year 2018
Apr 15,2018 The fourth and the final orbit raising operation of IRNSS-1I is successfully carried out at 21:05 hr IST on April 15,2018. The achieved perigee height is 35,462.9 km and apogee height is 35,737.8 km
Apr 15,2018 The third orbit raising operation of IRNSS-1I is successfully carried out at 22:50 hr IST on April 14,2018. The achieved perigee height is 31,426 km and apogee height is 35,739 km
Apr 14,2018 The third orbit raising operation of IRNSS-1I is successfully carried out at 22:50 hr IST on April 14,2018
Apr 14,2018 The second orbit raising operation of IRNSS-1I Satellite has been successfully carried out at 20:04 hr IST on April 13,2018. The achieved perigee height is 8683 km and apogee height is 35733 km.
Apr 13,2018 The second orbit raising operation of IRNSS-1I is successfully carried out at 20:04 hr IST on April 13,2018
Apr 13,2018 The first orbit raising operation of IRNSS-1I is successfully carried out at 4:19 hr IST on April 13,2018
Apr 12,2018 The first orbit raising operation of IRNSS-1I is planned to be carried out at 4:15 hr IST on April 13,2018. The targeted perigee height is 322 km and apogee height is 35887 km
Apr 10,2018 The 32 hr countdown activity has commenced at 20:04hr IST on Tuesday,April 10,2018 for the launch of PSLV-C41/IRNSS-1I Mission scheduled at 04:04 hr IST on April 12, 2018
Apr 01,2018 The second orbit raising operation of GSAT-6A satellite has been successfully carried out by LAM Engine firing for about 53 minutes on March 31,2018 in the morning.
Mar 30,2018 The first orbit raising operation of GSAT-6A Satellite has been successfully carried out by LAM Engine firing for 2188 sec from 09:22hr IST on March 30,2018.
Mar 29,2018 GSLV-F08 Successfully launches GSAT-6A
Mar 29,2018 GSLV-F08 Successfully launches GSAT-6A
Mar 29,2018 GSLV-F08/GSAT-6A - GSAT-6A satellite separated
Mar 29,2018 GSLV-F08/GSAT-6A - Cryogenic Engine Shutoff
Mar 29,2018 GSLV-F08/GSAT-6A - Cryogenic Upper Stage Performance is Normal
Mar 29,2018 GSLV-F08/GSAT-6A Cryogenic Upperstage Engine ignited. Third Stage performance is normal
Mar 29,2018 GSLV-F08/GSAT-6A Payload fairing Seperated
Mar 29,2018 GSLV-F08/GSAT-6A Second Stage Performance is Normal
Mar 29,2018 GSLV-F08/GSAT-6A L40 Engine Shutoff.
Mar 29,2018 GSLV-F08/GSAT-6A First Stage Performance is Normal
Mar 29,2018 GSLV-F08/GSAT-6A Liftoff Normal
Mar 29,2018 Mission Director has authorised Vehicle Director for launch. Vehicle Director has authorised initiation of Automatic Launch Secquence(ALS) program at 16:40 hr IST.
Mar 29,2018 Propellant filling operations of cryo stage are completed
Mar 29,2018 Propellant filling operations of cryo stage are under progress
Mar 29,2018 Preparations for propellant filling of cryo stage are under progress
Mar 29,2018 Real Time System simulation checks Completed. Countdown is progressing normally.
Mar 29,2018 Propellant filling operation of L40 Stages is completed by 02:20 hr IST.
Mar 28,2018 Propellant filling operation of L40 Stages is under progress. Countdown is progressing normally.
Mar 28,2018 Second Stage (GS2) UH25 filling is completed by 19:45 hr IST
Mar 28,2018 Second Stage (GS2) UH25 filling is under progress.
Mar 28,2018 Preparation for Second Stage (GS2) UH25 filling is under progress
Mar 28,2018 Second Stage (GS2) N2O4 filling completed by 16:15 hr IST
Mar 28,2018 Second Stage (GS2) N2O4 filling under progress
Mar 28,2018 Preparations for GSLV-F08 Second stage (GS2) propellant filling operation are under progress
Mar 28,2018 The 27 Hrs Countdown activities for the launch of GSLV-F08 /GSAT-6A Mission have started at 13:56 Hrs IST on Wednesday, March 28, 2018.
Mar 28,2018 AstroSat Picture of the Month (March 2018)
Mar 27,2018 Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 27 hr countdown activities starting at 13:56hr IST on Wednesday,March 28,2018 and the launch of GSLV-F08/GSAT-6A for Thursday,March 29,2018 at 16:56hr IST
Mar 24,2018 Indian Space Research Organisation (ISRO) gears up for the ‘36 hour Smart India Hackathon 2018 Grand Finale’
Mar 13,2018 On Information Security Incident of March 10,2018
Feb 28,2018 AstroSat Picture of the Month (Science Day-February 2018)
Feb 27,2018 AstroSat Picture of the Month (January 2018)
Feb 13,2018 NDTV Interview with Chairman ISRO
Feb 03,2018 Announcement of Opportunity (AO) for future Astronomy payload/mission
Feb 02,2018 AstroSat: Announcement of Opportunity (AO) soliciting proposals for fourth AO cycle observations
Jan 29,2018 Swachhta pakhwada(1st to 15th February 2018)
Jan 27,2018 ISRO technology know-how for production of NavIC Messaging Receiver for Indian Industries
Jan 23,2018 Images from INS-1C and Microsat
Jan 16,2018 First Day Image from Cartosat-2 Series Satellite
Jan 12,2018 PSLV-C40 Successfully Launches Cartosat-2 Series Satellite along with 30 Co-passenger Satellites
Jan 12,2018 PSLV-C40 Successfully Launches Cartosat-2 Series Satellite.
Jan 12,2018 All Nano Satellites Seperated Successfully
Jan 12,2018 LEO (Low Earth Orbit) -P1,POC-P1 Satellites Seperated
Jan 12,2018 Cartosat Satellite seperated
Jan 12,2018 Fourth Stage Engine Shutoff
Jan 12,2018 Fourth Stage Performance is Normal
Jan 12,2018 Fourth Stage Performance is Normal
Jan 12,2018 Third Stage Seperated. Foruth Stage Ignited
Jan 12,2018 Vehicle Coasting Normal
Jan 12,2018 Second Stage is shutdown. Third Stage is ignited. Performanc is normal
Jan 12,2018 Heat Shield Seperated. Performance is Normal
Jan 12,2018 PSLV-C40 /Cartosat-2 Series Mission - Liftoff Normal
Jan 12,2018 Mission Director has authorised Vehicle Director for launch. Automatic Launch Secquence (ALS) program initiation authorised by Vehicle Director and ALS started for launch at 09:13 hr IST.
Jan 11,2018 PSLV-C40/Cartosat-2 Series Mission - Propellant filling operations of Second Stage (PS2) are in progress
Jan 11,2018 Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant filling operation of Second Stage (PS2) are in progress.
Jan 11,2018 Propellant filling operation of fourth stage (PS4) of PSLV-C40 is completed. Countdown is progressing normally.
Jan 11,2018 Propellant filling operation of fourth stage (PS4) of PSLV-C40 is under progress
Jan 11,2018 The 28hr countdown activity of PSLV-C40/Cartosat2 Series Satellite Mission has started at 05:29hr IST today,Thursday, January 11, 2018
Jan 10,2018 Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 hr countdown of PSLV-C40/Cartosat2 Series Satellite mission for Thursday,January 11, 2018 starting at 05:29hr IST
Jan 09,2018 "Off The Cuff" with Chairman,ISRO
Dec 29,2017 Liquid Propulsion Systems Centre Pearl Jubliee Celebration
Dec 28,2017 AstroSat Picture of the Month (December 2017)
Nov 28,2017 AstroSat Picture of the Month (November 2017)
Nov 21,2017 Seeking comments on Draft "Space Activities Bill,2017" from the stake holders/public -regarding. pdf icon  PDF - 1.3 MB
Oct 28,2017 AstroSat Picture of the Month - Oct 2017
Oct 23,2017 Selection of Three Posters from Indian Students for APRSAF-24 Poster Contest
Oct 17,2017 AstroSat contributes to the saga of Gravitational Wave Astronomy
Sep 28,2017 AstroSat Completes 2 years in Orbit
Sep 26,2017 AstroSat Picture of the Month - Sep 2017 pdf icon  PDF - 5.2 MB
Sep 25,2017 ISRO released MOM Second year science data
Sep 16,2017 Rajbhasha Kirti Puraskar(2016-2017)
Aug 31,2017 PSLV-C39/IRNSS-1H Mission Unsuccessful
Aug 31,2017 PSLV-C39/IRNSS-1H mission Lift-off Normal
Aug 31,2017 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vechicle Director and ALS started for launch of PSLV-C39/IRNSS-1H Satellite mission at 18:47 hr IST
Aug 31,2017 The countdown operations of PSLV-C39/IRNSS-1H mission are progressing normally
Aug 31,2017 Propellant filling operations of second stage (PS2) of PSLV-C39 are completed
Aug 31,2017 Propellant filling operations of second stage (PS2) of PSLV-C39 are under progress
Aug 30,2017 Propellant filling operations of fourth stage (PS4) of PSLV-C39 are completed
Aug 30,2017 Propellant filling operations of fourth stage (PS4) of PSLV-C39 are under progress
Aug 30,2017 The 29 hrs countdown operations of PSLV-C39/IRNSS-1H mission have started on Wednesday,Aug 30,2017 at 14:00hr IST
Aug 29,2017 Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 29hr countdown of PSLV-C39/IRNSS-1H Satellite mission for Wednesday,Aug 30,2017 starting at 14:00 hr IST,
Aug 23,2017 PSLV-C39/IRNSS-1H Mission is scheduled to be launched on Aug 31,2017 at 19:00 Hrs from SDSC SHAR,Sriharikota.
Aug 18,2017 The IRNSS Signal-in-Space Interface Control Document ICD Ver 1.1 released
Aug 03,2017 AstroSat is completing 10,000th Orbit today
Jul 28,2017 A TRIBUTE TO PROF U R RAO
Jul 24,2017 Prof. U R Rao,Architect of Indian Satellite Programme passes away
Jul 03,2017 3 axis stabilisation of GSAT-17 has been successfully completed by 07:40 hrs IST on July 03,2017. Spacecraft systems are normal
Jul 02,2017 Deployment of both the Solar arrays and two antenna reflectors have been successfully completed by 16:15 hrs IST.
Jul 02,2017 The third and final orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine firing for 492 sec from 08:51 hr IST on July 02,2017
Jul 01,2017 The second orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine firing for 2896 sec from 11:03 hr IST on July 01,2017.
Jun 30,2017 The first orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine firing for 5912 sec from 04:38 hrs IST on June 30,2017.
Jun 29,2017 GSAT-17 successfully launched by Ariane-5 VA-238 from Kourou,French Guiana
Jun 24,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission - Message from President pdf icon  PDF - 279 KB
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: All 31 Satellites separated successfully
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: Cartosat Seperated, NIUSAT Seperated,
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: Fourth stage engine shut off
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: Fourth Stage performance is normal
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: Third stage separated.Fourth Stage Engine ignited
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: Coasting operation normal
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: Third stage action completed. Coasting phase initiated
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: Third stage performance normal
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: Second Stage Engine Shutoff,Third stage ignited
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: Heat shield separated
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: First Stage Seperated, Second Stage performance normal
Jun 23,2017 PSLV-C38 /Cartosat-2 Series Satellite Mission: First Stage Seperated, Second Stage Ignited
Jun 23,2017 PSLV-C38 Lift off Normal
Jun 23,2017 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vechicle Director and ALS started for launch of PSLV-C38/Cartosat2 Series Satellite mission at 09:17 hr IST
Jun 23,2017 Propellant filling operations of Second Stage (PS2) are completed. Countdown is progressing normally.
Jun 22,2017 Propellant filling operations of Second Stage (PS2) are in progress
Jun 22,2017 Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant filling operation of Second Stage (PS2) are in progress
Jun 22,2017 Propellant filling operation of fourth stage (PS4) of PSLV-C38 is completed
Jun 22,2017 Propellant filling operation of fourth stage (PS4) of PSLV-C38 is under progress
Jun 22,2017 The 28 hr countdown operation of PSLV-C38/Cartosat2 Series Satellite Mission has started on Thursday,June 22,2017 at 05:29 hr IST
Jun 21,2017 Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 hr countdown of PSLV-C38/Cartosat-2 Series Satellite mission for Thursday,June 22,2017 starting at 05:29 hr IST
Jun 13,2017 GSLV Mk III-D1/GSAT-19 Message from President
Jun 10,2017 West and East reflectors of GSAT-19 have been successfully deployed by 18:47 hr IST. Three axis stabilisation of GSAT-19 has been achieved by 19:42 hr IST
Jun 10,2017 South and North solar arrays of GSAT-19 have been successfully deployed by 16:15 hr IST
Jun 10,2017 The fourth and final orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 488 sec from 07:59 hr IST on June 10,2017
Jun 10,2017 The third orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 3469 sec from 09:55 hr IST on June 09,2017
Jun 08,2017 The second orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 5538 sec from 15:44 hr IST on June 07,2017.
Jun 08,2017 The first orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 116 sec from 14:03 hr IST on June 06,2017.
Jun 05,2017 GSLV Mk III-D1 Successfully launches GSAT-19
Jun 05,2017 GSLV Mk III-D1/GSAT-19 Mission: GSAT-19 separated and injected into orbit successfully.
Jun 05,2017 GSLV Mk III-D1/GSAT-19 Mission: Cryogenic Stage Performance is Normal
Jun 05,2017 GSLV Mk III-D1/GSAT-19 Mission: L110 Separated Successfully. C25 Ignition confirmed.
Jun 05,2017 GSLV Mk III-D1/GSAT-19 Mission: L110 Ignited. Vehicle Peformance is Normal
Jun 05,2017 GSLV Mk III-D1/GSAT-19 Mission Lift off Normal
Jun 05,2017 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and ALS started for launch of GSLV Mk III D1 /GSAT-19 mission at 17:17 Hrs IST
Jun 05,2017 GSLV Mk III-D1/GSAT-19: Propellant filling operations of cryo stage are completed
Jun 05,2017 Propellant filling operations of L110 (Second Stage) of GSLV Mk III D1 are completed
Jun 04,2017 Propellant filling operations of L110 (Second Stage) of GSLV Mk III D1 are under progress. Countdown is progressing normally.
Jun 04,2017 The 25 and half hr countdown operations of GSLV Mk III D1 /GSAT-19 mission started today,Sunday,June 04,2017 at 15:58 hr IST
Jun 02,2017 Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 25 and half hr countdown of GSLV MkIII D1 /GSAT-19 mission for Sunday,June 04,2017 starting at 15:58 hr IST
Jun 01,2017 AstroSat CZTI and the search for X-ray counterparts to gravitational wave sources
May 29,2017 GSLV Mk III-D1/GSAT-19 Mission is scheduled to be launched on June 05,2017 at 17:28 Hrs (IST) from SDSC SHAR, Sriharikota
May 18,2017 ISRO Receives Indira Gandhi Prize for Peace,Disarmament and Development for 2014
May 09,2017 GSLV-F09 /GSAT-9 - Message from President
May 08,2017 Deployment of East and West reflectors have been successfully completed at 08:15 hr IST and 09:30 hr IST,respectively on May 08, 2017
May 08,2017 The third orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine firing for 445.8 sec from 06:51:52 hr IST on May 08,2017
May 07,2017 Orbit Determination results from the second LAM firing are: apogee X perigee height was changed to 35858 km X 28608 km. Inclination is 0.755deg. Orbital period is 20hr 58min.
May 07,2017 The second orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine firing for 3529.7 sec from 09.30 hr IST on May 07,2017
May 06,2017 The first orbit raising operation of South Asia Satellite has been successfully carried out by LAM Engine
May 05,2017 India Successfully launches South Asia Satellite, GSAT-9
May 03,2017 Announcement of Opportunity (AO) soliciting proposals for third AO cycle observations
Mar 07,2017 Message from J&K Governor on PSLV-C37 Misson
Feb 27,2017 A minor fire incident happened with the stored waste propellant at Sriharikota.
Feb 27,2017 PSLV- C37 /CARTOSAT- 2 Series Satellite - Message from President
Feb 26,2017 PM @narendramodi mentiones the accomplishments of @isro during #MannKiBaat
Feb 18,2017 ISRO Successfully Tests its Cryogenic Stage (C25) for GSLV MkIII for the Flight Duration
Feb 15,2017 PSLV C37 /Cartosat-2 Series Mission - Third Stage Performance is Normal
Feb 15,2017 PSLV C37 /Cartosat-2 Series Mission - Second Stage Seperated. Third Stage Ignited.
Feb 15,2017 PSLV-C37 /Cartosat 2 Series Mission - Heat Shield Seperated
Feb 15,2017 PSLV C37 /Cartosat-2 Series Mission - Lift Off Normal
Feb 15,2017 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and ALS started for launch at 09:16 Hrs IST
Feb 15,2017 Real Time System simulation & Data transmission checks Completed. Vehicle Internal Checks Completed. Countdown is progressing normally
Feb 15,2017 N2O4 tank filling and UH25 tank filling operations of Second Stage (PS2) of PSLV-C37 are completed. Countdown is progressing normally.
Feb 14,2017 Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant filling operation of Second Stage (PS2) are in progress.
Feb 14,2017 Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 is completed
Feb 14,2017 Mono Methyl Hydrazine (MMH) propellant filling operation of fourth stage (PS4) of PSLV-C37 is completed
Feb 14,2017 The 28 Hrs countdown activity of PSLV-C37/Cartosat2 Series Satellite Mission has started at 05:28 Hrs IST today,Tuesday, February 14,2017
Feb 13,2017 Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 Hrs countdown of PSLV-C37 Launch
Feb 10,2017 PSLV-C37 /Cartosat -2 Series Satellite Mission is scheduled to be launched on February 15,2017 at 9.28 Hrs IST from SDSC SHAR Sriharikota
Jan 26,2017 ISRO Successfully Tests C25 Cryogenic Upper Stage of GSLV MkIII
Dec 15,2016 PSLV-C36 /RESOURCESAT-2A - Message from President
Dec 07,2016 PSLV-C36/RESOURCESAT-2A: Solar panels deployed successfully
Dec 07,2016 PSLV-C36 Successfully launches RESOURCESAT-2A
Dec 07,2016 PSLV-C36/RESOURCESAT-2A: Fourth Stage Performance is Normal
Dec 07,2016 PSLV-C36/RESOURCESAT-2A: PS3 stage Seperated. PS4 stage Ignited.
Dec 07,2016 PSLV-C36/RESOURCESAT-2A: Second Stage is Seperated,Third stage is ignited
Dec 07,2016 PSLV-C36/RESOUCESAT-2A: Heat Shield Seperated,Vehicle Performance is Normal
Dec 07,2016 PSLV-C36/RESOURCESAT-2A: Second Stage Performance is Normal
Dec 07,2016 PSLV-C36/RESOURCESAT-2A: Air lead Strapon is Seperated
Dec 07,2016 PSLV-C36/RESOURCESAT-2A: First Stage Seperation normal. Second Stage ignited.
Dec 07,2016 PSLV-C36/RESOURCESAT-2A: Vehicle Lift of is Normal
Dec 07,2016 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vechicle Director and ALS started for launch of PSLV-C36/RESOURCESAT-2A mission at 10:13 hr IST
Dec 07,2016 Real Time Simulation Checks and Data Transmission Checks completed. Resourcesat-2A Spacecraft Switched 'ON'. Launch Vechicle internal Checks completed. Countdown is progressing normally.
Dec 06,2016 N2O4 and UH25 tank filling operations of Second Stage (PS2) of PSLV-C36 are completed by 23:20 hrs. Countdown is progressing normally.
Dec 06,2016 Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant filling operation of Second Stage (PS2) are in progress.
Dec 06,2016 Mono Methyl Hydrazine (MMH) fuel and Mixed Oxides of Nitrogen (MON-3) oxidiser filling operations of fourth stage (PS4) of PSLV-C36 are completed
Dec 05,2016 The 36 hr countdown activity of PSLV-C36/RESOURCESAT-2A Mission has started at 22.25 hr IST today,Monday,December 05, 2016
Dec 05,2016 Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 36 hr countdown of PSLV-C36/RESOURCESAT-2A mission for Monday,December 05,2016 starting at 22:25 hr IST
Nov 30,2016 PSLV-C36 /RESOURCESAT-2A is scheduled to be launched on December 07, 2016 at 10:25 hrs from SDSC SHAR,Sriharikota
Nov 23,2016 ISRO/DOS community grieves the passing away of Prof. M G K Menon
Oct 26,2016 All the planned activities of Station Acquisition Manoeuvres and In-Orbit-Testing (IOT) of GSAT-18 have been successfully completed
Oct 09,2016 After all the successful deployments on GSAT-18,3-axis stabilisation using reaction wheels has been achieved at 19:26hr IST on Oct 09,2016. The performance of subsystems of the spacecraft is normal
Oct 09,2016 North Solar Array and East Antenna have been successfully deployed
Oct 09,2016 Solar Array and West Antenna of GSAT-18 have been successfully deployed
Oct 09,2016 Orbit Determination results from the third LAM firing are: apogee X perigee height was changed to 35802km,35294km, Inclination is 0.136deg. Orbital period now is 23hr 44m
Oct 09,2016 Third LAM firing of GSAT-18,for 256.17 sec has been successfully completed on October 9,2016 starting from 10.21 hr IST
Oct 08,2016 The Second orbit raising manoeuvre of GSAT-18 has been successfully carried out by LAM Engine firing for sec from 11:29 hr IST on October 08,2016
Oct 07,2016 The first orbit raising manoeuvre of GSAT-18 has been successffully carried out by LAM Engine firing for 6040.6 sec from 03:46 Hrs IST on Oct 07,2016.
Oct 06,2016 GSAT-18 successfully launched by Ariane-5 VA-231 from Kourou,French Guiana
Oct 05,2016 Launch of GSAT-18 is postponed by a day to Oct 06,2016
Sep 29,2016 A science meet to commemorate one year of AstroSat in orbit
Sep 29,2016 ISRO receives Priyadarshini Global Award 2016
Sep 29,2016 GSAT-18 is scheduled to be launched on October 05,2016 between 02:00 Hrs – 03:15 Hrs (IST) from Kourou,French Guiana by Ariane-5 VA-231
Sep 26,2016 PSLV-C35 Successfully placed all Satellites into their respective Orbits.
Sep 26,2016 Pathfinder-1 Satellite is Separated
Sep 26,2016 ALSAT-2B Satellite is Separated
Sep 26,2016 ALSAT-1B Satellite is Separated
Sep 26,2016 PRATHAM and PISAT Satellites are Separated
Sep 26,2016 NLS-19 Satellite is Separated
Sep 26,2016 ALSAT-1N Satellite is Separated
Sep 26,2016 PSLV-C35 Successfully launches SCATSAT-1. Seperation of the remaining 7 satellites expected to occur between 11.25 hr IST and 11.28 hr IST
Sep 26,2016 PS4 Fourth Stage Engine Shut-off
Sep 26,2016 PS4 Fourth Stage Performance Normal
Sep 26,2016 PS4 Fourth Stage Engine Ignited
Sep 26,2016 PS3 Third Stage is Separated
Sep 26,2016 PS3 Third Stage Performance Normal
Sep 26,2016 PS2 Stage Seperated,PS3 Thrid Stage Ignited
Sep 26,2016 Heat Shield Seperated
Sep 26,2016 PSLV-C35 PS1 Stage Seperated and PS2 Second Stage Ignited
Sep 26,2016 Lift-off Normal
Sep 26,2016 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and ALS started for launch at 09:00 hr IST
Sep 26,2016 UH25 tank filling operations of Second Stage (PS2) are completed. Real time system simulation checks and Launch Vehicle internal checks are completed. Countdown is progressing noramally
Sep 25,2016 Real time system simulation checks are under progress
Sep 25,2016 N2O4 tank filling of Second Stage (PS2) is completed. UH25 tank filling operations of Second Stage (PS2) are under progress
Sep 25,2016 N2O4 tank filling of Second Stage (PS2) is under progress
Sep 25,2016 Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant filling operation of Second Stage (PS2) are in progress
Sep 25,2016 PSLV-C35 /SCATSAT-1 Mission Countdown progressing normally
Sep 24,2016 MON-3 oxidiser filling operations of PS4 are completed by 18:00 hr IST
Sep 24,2016 Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 are under progress
Sep 24,2016 MMH Propellant filling operation has been completed by 12:30 hr IST. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 are under progress
Sep 24,2016 Mono Methyl Hydrazine (MMH) propellant filling operation of fourth stage (PS4) of PSLV-C35 is under progress
Sep 24,2016 The 48 and half hr countdown activity of PSLV-C35/SCATSAT-1 Mission has started at 08:42 hr IST today,Saturday, September 24, 2016
Sep 23,2016 Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 48 and half hr countdown of PSLV-35/SCATSAT-1 Mission
Sep 21,2016 PSLV-C35 is scheduled to be launched on Monday morning at 9:12 hrs (IST) on September 26,2016 from SDSC SHAR , Sriharikota
Sep 19,2016 GSLV-F05 /INSAT-3DR - Message from President
Sep 17,2016 First IR Images from INSAT-3DR IMAGER taken today at 09:00 hrs IST
Sep 16,2016 Rajbhasha Kirti Puraskar(2015-2016)
Sep 11,2016 Orbit Determination results from the third LAM firing are: apogee X perigee height was changed to 35908km,35326km, Inclination is 0.121deg. Orbital period is 23hr 47m 26sec
Sep 11,2016 Third LAM firing of INSAT-3DR for 294 sec has been successfully completed on September 11,2016 starting from 08:31 hr IST
Sep 10,2016 Second LAM firing of INSAT-3DR,at apogee for 3174sec has been successfully completed
Sep 09,2016 The first apogee raise maneuver of INSAT-3DR has been successfully carried out.
Sep 08,2016 GSLV-F05 Successfully launches INSAT-3DR
Sep 08,2016 GSLV-F05 /INSAT-3DR Mission: Injected INSAT-3DR into orbit
Sep 08,2016 GSLV-F05 /INSAT-3DR Mission: GS1 Stage Seperated. GS2 Ignited
Sep 08,2016 Cryo Stage Ignition is authorized
Sep 08,2016 GSLV-F05 /INSAT-3DR Mission: Cryogenic Ignition confirmed
Sep 08,2016 GSLV-F05 /INSAT-3DR Mission: GS2 Performance is normal
Sep 08,2016 GSLV-F05 /INSAT-3DR Mission: Heat Shield Separated
Sep 08,2016 GSLV-F05 /INSAT-3DR Mission: Lift-off Normal
Sep 08,2016 GSLV-F05 Mission Director Authorized the Launch
Sep 08,2016 Launch is rescheduled to 16:50 hr IST Countdown is progressing normally
Sep 08,2016 Launch Real Time System simulation checks Completed by 08:15 hr IST. Countdown is progressing normally
Sep 08,2016 N2O4 filling into four L40 Strap-On Stages completed by 03:00 hr IST
Sep 07,2016 UH25 filling into four L40 Strap-On Stages completed by 21:00hr IST
Sep 07,2016 Second Stage (GS2) UH25 filling completed by 17:40 hr IST
Sep 07,2016 Second Stage (GS2) UH25 filling under progress
Sep 07,2016 Second Stage (GS2) N2O4 filling completed by 13:30 hr IST. Preparations for Second Stage (GS2) UH25 filling are under progress
Sep 07,2016 Second stage (GS2) N2O4 filling under progress
Sep 07,2016 Preparations for Second stage (GS2) propellant filling operation are under progress
Sep 07,2016 The 29 hr countdown operation of GSLV-F05/INSAT-3DR Mission has started at 11:10 hr IST on Wednesday,September 7, 2016
Sep 05,2016 Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 29 hr countdown starting at 11.10 hr IST on Wednsday,September 7,2016 and the launch of GSLV-F05/INSAT-3DR Mission for Thursday,September 8,2016 at 16.10 hr
Sep 01,2016 GSLV-F05 /INSAT-3DR Mission is scheduled to be launched on Sept 08, 2016 at 16:10 hrs (IST) from SDSC,SHAR,Sriharikota
Sep 01,2016 President congratulates ISRO for the successful conduct of Futuristic Rocket Test - Advanced Technology Vehicle (ATV)
Aug 31,2016 AstroSat observes the high energy X-ray variability of a black hole system
Aug 29,2016 Remembering IRS-1B which was launched exactly 25 years back
Jun 22,2016 President of India congratulates ISRO on the successful launch of PSLV-C34
Jun 22,2016 PSLV-C34 /CARTOSAT-2 Series Satellite Seperated and Injected into Orbit
Jun 22,2016 PSLV-C34 /CARTOSAT-2 series PS4 Engine Shutdown. Injection Conditions achieved
Jun 22,2016 PSLV-C34 /CARTOSAT-2 Series PS3 seperated. PS4 Engine Started.
Jun 22,2016 PSLV-C34 /CARTOSAT-2 Series PS2 Seperated,Third stage performance is normal
Jun 22,2016 PSLV-C34 /CARTOSAT-2 Series Launch Heat Shield is Seperated. 2nd stage performance is normal
Jun 22,2016 PSLV-C34 /CARTOSAT-2 Series Lift-off Normal
Jun 22,2016 PSLV-C34 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and ALS started at 09:12 hr IST for launch
Jun 22,2016 Propellant filling operation of Second stage (PS2) of PSLV-C34 is completed. Vehicle internal checks are in progress. Countdown is progressing normally.
Jun 21,2016 Propellant filing operation of Second stage (PS2) of PSLV-C34 is under progress.
Jun 21,2016 Spacecraft health checks and preparations for propellant filling operation of second stage (PS2) of PSLV-C34 are under progress. Countdown is progressing normally.
Jun 20,2016 Filling of Mixed Oxides of Nitrogen (MON-3) of PS4 is Completed
Jun 20,2016 Filling of Mixed Oxides of Nitrogen (MON-3) of PS4 is under progress
Jun 20,2016 Mono Methyl Hydrazine (MMH) filling operation of Fourth stage (PS4) of PSLV-C34 is completed by 12:06 hr (IST). Preparations for filling of Mixed Oxides of Nitrogen (MON-3) of PS4 are under progress
Jun 20,2016 The 48hr countdown activity of PSLV-C34/CARTOSAT-2 Series Satellite mission has started at 09:26 hr IST today,Monday, June 20, 2016
Jun 19,2016 Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 48 hr countdown starting at 09:26hr IST on Monday,June 20,2016 and the launch of PSLV-C34/CARTOSAT-2 Series Satellite Mission for Wednesday,June 22, 2016
Jun 16,2016 PSLV-C34/CARTOSAT-2 Series Satellite Mission : Launch scheduled on June 22,2016 at 09:25 hrs (IST) from SDSC,SHAR,Sriharikota
Jun 14,2016 ISRO receives NIQR-GKD Award for Outstanding Organisation
Jun 07,2016 17th IIRS Outreach Programme on "Geoweb Services and Geoportal applications” being conducted during June 28 - July 15, 2016
May 20,2016 AstroSat Support Cell (ASC) has been Set up at IUCAA, Pune
May 03,2016 India and France jointly released a set of two commemorative postage stamps,highlighting 50 years of space co-operation between the two countries
May 03,2016 The fourth and the final LAM firing of IRNSS-1G,for 231sec has been successfully completed on 03.05.2016 starting from 01:27hr IST
May 02,2016 Orbit Determination results from the third LAM firing are: apogee X perigee height was changed to 35813km,29050km, Inclination is 5.72deg. Orbital period now is 21hr 08m 09sec
May 01,2016 Third LAM firing of IRNSS-1G,for 1609sec has been successfully completed on 01.05.2016 starting from 06:59:07 hr IST.
May 01,2016 Orbit Determination results from second LAM firing are:apogee X perigee height was changed to 35803km,7750km,Inclination is 10.77deg.Orbital period now is 13h 03m 35sec
Apr 30,2016 PSLV-C33/IRNSS-1G Update : Second LAM firing of IRNSS-1G, at apogee for 1581 sec has been successfully completed on April 30,2016 starting from 04:52:17 hrs IST.
Apr 30,2016 PSLV-C33/IRNSS-1G Update : The first apogee raise maneuver of IRNSS-1G has been successfully carried out for 1147 sec from 13:05 hrs IST on April 29,2016.
Apr 28,2016 PSLV-C33/IRNSS-1G Update : Lift off normal
Apr 28,2016 Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and ALS started for launch at 12:38 hrs IST.
Apr 28,2016 Real Time simulation & Data transmission checks completed. Vehicle Internal Checks Completed.
Apr 28,2016 Propellant (N2O4 and UH25) filling operations of Second Stage (PS2) are completed by midnight. Countdown is progressing normally.
Apr 27,2016 Mobile Service Tower(MST) withdrawal to parking End is completed.
Apr 27,2016 Countdown operations are progressing normally. Preparations for Mobile Service Tower (MST) withdrawal and Propellant filling operation of second stage (PS2) are in progress.
Apr 26,2016 Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 is completed.Countdown is progressing normally
Apr 26,2016 MMH propellant filling operation has been completed. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 are under progress.
Apr 26,2016 Mono Methyl Hydrazine (MMH) propellant filling operation of fourth stage (PS4) of PSLV-C33 is commenced and is under process
Apr 26,2016 The 51 hr 30 min countdown activity of PSLV-C33/IRNSS-1G Mission has started at 9:20 hr IST today,Tuesday, April 26, 2016
Apr 25,2016 Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 51.5 hr countdown starting at 09:20hr IST on Tuesday,April 26,2016 and the launch of PSLV-C33/IRNSS-1G Mission for Thursday,April 28,2016 at 12:50 hr. IST
Apr 12,2016 Asia Pacific Remote Sensing Symposium held at New Delhi
Mar 30,2016 IRNSS-1F UPDATE: After successful completion of four station acquisition manoeuvers and In Orbit Testing (IOT) of the spacecraft, IRNSS-1F has been placed in the intended Geo-synchronous orbit
Mar 16,2016 PSLV-C32 Message from President
Mar 15,2016 IRNSS-1F UPDATE: Orbit Determination results from fourth LAM firing
Mar 14,2016 IRNSS-1F UPDATE: Fourth LAM firing of IRNSS-1F,for 78.8 sec has been successfully completed on 14.3.2016 starting from 11:42:44 hr (IST).
Mar 14,2016 IRNSS-1F UPDATE: Orbit Determination results from the third LAM firing
Mar 13,2016 IRNSS-1F UPDATE: Third LAM firing of IRNSS-1F,for 1561 sec has been successfully completed on 13.3.2016 starting from 11:32 hr IST.
Mar 12,2016 Second LAM firing of IRNSS-1F,at apogee for 1918.5 sec has been successfully completed on 12.3.2016 starting from 07:57:54 hr IST.
Mar 12,2016 The apogee raise maneuver of IRNSS-1F has been successfully carried out
Mar 10,2016 PSLV-C32/IRNSS-1F: PSLV C32 Successfully Launches IRNSS 1F into the orbit
Mar 10,2016 PSLV-C32/IRNSS-1F: Lift off normal!
Mar 10,2016 PSLV-C32/IRNSS-1F: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and ALS started at 15:48hr IST for launch
Mar 10,2016 PSLV-C32/IRNSS-1F UPDATE: The launch time is revised to 16:01 hr (IST) for collision avoidance as per the space debris studies. Countdown status normal.
Mar 10,2016 PSLV-C32/IRNSS-1F UPDATE: IRNSS-1F spacecraft switched ON. PSLV-C32 -VEHICLE INTERNAL CHECKS Completed. Countdown status normal.
Mar 10,2016 PSLV-C32/IRNSS-1F UPDATE: Real time simulation checks and data transmission checks completed.
Mar 10,2016 PSLV-C32/IRNSS-1F UPDATE: UH-25 tank filling operation of second stage (PS2) is completed by 03:00hr (IST)Countdown activities are progressing normally.
Mar 10,2016 PSLV-C32/IRNSS-1F UPDATE: N2O4 tank filling of Second Stage (PS2) is completed by 00:15 hrs (IST) of March 10,2016.
Mar 09,2016 PSLV-C32/IRNSS-1F UPDATE: Preparations for N2O4 tank filling of Second stage (PS2) are under progress. PSLV-C32 Mission-Countdown. Progressing status- normal.
Mar 08,2016 PSLV-C32/IRNSS-1F UPDATE: Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 is completed. Countdown is progressing normally
Mar 08,2016 PSLV-C32/IRNSS-1F UPDATE: Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 is started at 19:00hr (IST)
Mar 08,2016 MMH propellant filling operation has been completed. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 are under progress
Mar 08,2016 Mono Methyl Hydrazine (MMH) propellant filling operation of fourth stage (PS4) of PSLV-C32 is commenced at 12:30 (IST) and is under progress
Mar 08,2016 The 54hr 30min countdown activity of PSLV-C32/IRNSS-1F Mission has started at 09:30hr IST today,Tuesday,March 8, 2016
Mar 08,2016 PSLV-C32/IRNSS-1F UPDATE: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 54 and half hr countdown starting at 09:30hr IST on Tuesday,March 8,2016 and the launch for March 10,2016
Mar 02,2016 Media Registration for PSLV-C32/IRNSS-1F Launch
Feb 28,2016 Global Albedo Map of Mars
Feb 22,2016 CE 20 Engine of GSLV MKIII successfully hot tested
Feb 01,2016 PSLV-C31-Message From President
Jan 24,2016 IRNSS-1E Update: The fourth and final orbit raising operation has been successfully carried out for 447 sec (~7.45 min) from 22:49 hrs IST on Jan 23,2016.
Jan 23,2016 IRNSS-1E Update: The third orbit raising operation has been successfully carried out by firing the LAM engine for 1507 sec (~25 min) from 03:19 hrs IST on Jan 23,2016.
Jan 23,2016 IRNSS-1E Update: The perigee raise maneuver has been successfully carried out for 1515.36 sec (~25.5 min) from 01:29 hrs IST on Jan 22,2016.
Jan 21,2016 IRNSS-1E Update: The apogee raise maneuver of IRNSS-1E has been successfully carried out for 1197 sec (~20 min) from 09:41 hrs IST on Jan 21,2016. This LAM firing is expected to change apogee X perigee height to 35882kmX320 km
Jan 20,2016 PSLV-C31/IRNSS-1E Launch Update: PSLV-C31 Successfully Launches IRNSS-1E into the orbit.
Jan 20,2016 PSLV-C31/IRNSS-1E Launch Update: Lift off Normal
Jan 20,2016 PSLV-C31/IRNSS-1E Launch Update: Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and ALS started for launch at 09:19hr IST
Jan 20,2016 PSLV-C31/IRNSS-1E Update: Countdown is progressing normally. 20 minutes to launch.
Jan 19,2016 PSLV-C31/IRNSS-1E Update: UH-25 tank filling operation of second stage (PS2) is completed by 22:00hr (IST)
Jan 19,2016 PSLV-C31/IRNSS-1E Update: N2O4 tank filling of Second Stage (PS2) completed by 18:45hr IST
Jan 19,2016 PSLV-C31/IRNSS-1E Update: N2O4 tank filling of Second Stage (PS2) is under progress
Jan 18,2016 Mono Methyl Hydrazine (MMH) propellant filling operation of fourth stage (PS4) of PSLV-C31 is under progress
Jan 18,2016 The 48hr countdown activity of PSLV-C31/IRNSS-1E Mission has started at 09:31hr IST today,Monday,January 18,2016
Jan 18,2016 PSLV-C31/IRNSS-1E Update: Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 is completed by 18:15 hr IST. Countdown is progressing normally
Jan 18,2016 PSLV-C31/IRNSS-1E update: MMH propellant filling operation has been completed by 13:00 hr IST. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 are under progress
Jan 17,2016 PSLV-C31/IRNSS-1E Update: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 48hr countdown starting at 09:31 Hrs IST on Monday,January 18, 2016
Jan 13,2016 Media Registration for PSLV-C31/IRNSS-1E Launch
Jan 05,2016 Vacancy Notification,Advertisement & Application Format for the post of director-PRL
Jan 04,2016 GSAT-15 Satellite is Operational. The health of spacecraft is normal
Jan 02,2016 Commissioning of 200 KWp Solar Power Plant at SAC
Jul 30, 2015 ISRO AND NASA WORKING ON NISAR MISSION