गैलरी होम गतिविधियाँ मिशन पूरा


PSLV-C33 Lift off
PSLV-C33 Lift off
PSLV-C33 Lift off
Side View of Fully integrated PLSV-C33
Fully integrated PLSV-C33 with IRNSS-1G at First Launch Pad, SHAR Sriharikota
PSLV-C33  heat shield closed with IRNSS-1G encapsulated
IRNSS-1G spacecraft integrated with PSLV-C33 with two halves of the heat shields seen
Fuel filling of IRNSS-1G in progress at SDSC SHAR
Second stage  of PSLV-C33 being prepared for vehicle integration
PSLV-C33 core stage integrated over the  launch pedestal
IRNSS-1G at clean room at SDSC SHAR
IRNSS-1G being de-containerised at clean room at SDSC SHAR
Container with IRNSS-1G is being loaded on to the truck for  transportation to SDSC SHAR from ISITE, ISAC Bengaluru
IRNSS-1G being loaded into Large Space Simulation Chamber (LSSC) for thermal vacuum test
IRNSS-1G being prepared for a pre-launch test
IRNSS-1G during initial phase of integration

अधिक जानकारी

अधिक जानकारी