PSLV-C33/IRNSS-1G Gallery Home / Missions accomplished


PSLV-C33 Lift off PSLV-C33 Lift off PSLV-C33 Lift off IRNSS-1G during initial phase of integration
Side View of Fully integrated PLSV-C33 PSLV-C33 core stage integrated over the  launch pedestal PSLV-C33  heat shield closed with IRNSS-1G encapsulated Fuel filling of IRNSS-1G in progress at SDSC SHAR
Second stage  of PSLV-C33 being prepared for vehicle integration IRNSS-1G at clean room at SDSC SHAR IRNSS-1G being de-containerised at clean room at SDSC SHAR IRNSS-1G spacecraft integrated with PSLV-C33 with two halves of the heat shields seen
Side View of Fully integrated PLSV-C33 Container with IRNSS-1G is being loaded on to the truck for  transportation to SDSC SHAR from ISITE, ISAC Bengaluru IRNSS-1G being loaded into Large Space Simulation Chamber (LSSC) for thermal vacuum test IRNSS-1G being prepared for a pre-launch test