GSLV- F05 Gallery Home / Activities / Missions accomplished


Nozzle End Segment of GSLV-F05 First Stage being placed on the Mobile Launch Pedestal INSAT-3DR Satellite in clean room at Sriharikota GSLV-F05 take off First Image from INSAT-3DR - Visible Band GSLV-F05 take off Encapsulated Assembly of payload fairing containing INSAT-3DR being inegrated at VAB Indigenous Cryogenic Upper Stage  being integrated with GSLV-F05 Second Stage
Strap-ons being integrated with the Core Stage Hoisting of GSLV-F05 Second Stage during Vehicle Assembly The fully integrated GSLV-F05 carrying INSAT-3DR approaching the second launch pad GSLV-F05 take off First Image from INSAT-3DR - SWIR Band INSAT-3DR Satellite in clean room with  solar panel deployed Strap-on Motors of GSLV-F05 being integrated with the Core Stage
Indigenously developed Cryogenic Upper Stage undergoing testing GSLV-F05 take off GSLV-F05 take off The fully integrated GSLV-F05 carrying INSAT-3DR at the Second Launch Pad (SLP) Fully integrated GSLV-F05 coming out of the Vehicle Assembly Building INSAT-3DR seen with two halves of payload faring of GSLV-F05
GSLV-F05 take off GSLV-F05 take off GSLV-F05 take off GSLV-F05 being moved from Vehicle Assembly Building to Launch Pad Two halves of GSLV-F05 payload fairing enclosing INSAT-3DR being closed Two Segments of the GSLV-F05 First Stage being joined together at the Vehicle Assembly Building

More Details

More Details