PSLV-C20/SARAL गैलरी होम गतिविधियाँ मिशन पूरा


PSLV-C20 Take Off - View 3
PSLV-C20 Take Off - View 2
PSLV-C20 Take Off - View 1
PSLV-C20 on First Launch Pad with Umbilical tower to its left
Panoramic view of PSLV-C20 on the First Launch Pad with Mobile Service Tower at a distance
Full view of PSLV-C20 standing on First Launch Pad as Mobile Service Tower moves back
A view of fully assembled PSLV-C20 from the top of Vehicle Assembly Building
Stacking of PSLV-C20 third and fourth stages in the Mobile Service Tower

अधिक जानकारी

A view of PSLV-C20 second stage liquid engine during vehicle assembly
A view of PSLV-C20 after the completion of its assembly upto fourth stage at Mobile Service Tower
PSLV-C20 fourth stage integration in progress
PSLV-C20 second stage integration in progress
PSLV-C20 first stage assembly in progress at Mobile Service Tower
One of the segments of first stage of PSLV - C20 at Mobile Service Tower
SARAL satellite mounted on top of the conical Dual Launch Adaptor with two small satellite mounted inside
SAPPHIRE and NEOSSAT assembled on Dual Launch Adaptor
PSLV - C20 Heat Sheild Closed - view from top
Panoramic view of SARAL (top) and smaller satellites (below) attached to the fourth stage of PSLV-C20
Close up view of SARAL satellite on PSLV - C20
SARAL attached to the fourth stage of PSLV-C20
SARAL satellite at Clean Room in Satish Dhawan Space Centre, Sriharikota

अधिक जानकारी