150 Years of Celebrating the MahatmaNational Emblem ISRO Logo
Department of Space, Indian Space Research Organisation

PUBLIC NOTICE - ATTENTION : JOB ASPIRANTS

Filling up the post of Controller in U R Rao Satellite Centre (URSC), Department of Space, ISRO, Bengaluru in Level 14 of Pay Matrix (7th CPC) on Deputation basis (Last date for submission is 15/11/2021)
Announcement of Opportunity for Chandrayaan-2 science data utilisationLast date for submission of proposals is Oct 31, 2021
The current e-procurement site is proposed to switch over to new website. All the registered/new vendors are requested to visit new website at https://eproc.isro.gov.in and validate your credentials for participating with ISRO centres.
Jul 05, 2018

CREW ESCAPE SYSTEM

SUCCESSFUL FLIGHT TESTING OF CREW ESCAPE SYSTEM - TECHNOLOGY DEMONSTRATOR

ISRO carried out a major technology demonstration on July 05, 2018, the first in a series of tests to qualify a Crew Escape System, which is a critical technology relevant for human spaceflight. The Crew Escape System is an emergency escape measure designed to quickly pull the crew module along with the astronauts to a safe distance from the launch vehicle in the event of a launch abort. The first test (Pad Abort Test) demonstrated the safe recovery of the crew module in case of any exigency at the launch pad.

After a smooth countdown of 5 hours, the Crew Escape System along with the simulated crew module with a mass of 12.6 tonnes, lifted off at 07.00 AM (IST) at the opening of the launch window from its pad at Satish Dhawan Space Centre, Sriharikota. The test was over in 259 seconds, during which the Crew Escape System along with crew module soared skyward, then arced out over the Bay of Bengal and floated back to Earth under its parachutes about 2.9 km from Sriharikota. 

The crew module reached an altitude of nearly 2.7 km under the power of its seven specifically designed quick acting solid motors to take away the crew module to a safe distance without exceeding the safe g-levels. Nearly 300 sensors recorded various mission performance parameters during the test flight. 

CES Liftoff  Crew module landing

Watch Lift of Video