G O V E R N M E N T   O F   I N D I A  
Skip to main content A- A A+ Facebook Twitter Twitter Instagram
Home/IRNSS Programme/PSLV-C33/IRNSS-1G
National Emblem ISRO Logo
Department of Space
Indian Space Research Organisation
This Website belongs to Department of Space, Government of India
Click here for Online submission of proposals for RESPOND BASKET 2022 in I-GRASP portal - Last date for online submission is extended to June 15, 2022

 

Search form

  • English
  • हिन्दी
  • Missions
  • Spacecraft
  • Launchers
  • Applications
  • Media
  • About
  • Request transponder capacity
  • Chandrayaan 2
Home/IRNSS Programme/PSLV-C33/IRNSS-1G

PSLV-C33/IRNSS-1G Gallery

PSLV-C33 Lift off
PSLV-C33 Lift off
PSLV-C33 Lift off
Side View of Fully integrated PLSV-C33
Fully integrated PLSV-C33 with IRNSS-1G at First Launch Pad, SHAR Sriharikota
PSLV-C33  heat shield closed with IRNSS-1G encapsulated
IRNSS-1G spacecraft integrated with PSLV-C33 with two halves of the heat shields seen
Fuel filling of IRNSS-1G in progress at SDSC SHAR
Second stage  of PSLV-C33 being prepared for vehicle integration
PSLV-C33 core stage integrated over the  launch pedestal
IRNSS-1G at clean room at SDSC SHAR
IRNSS-1G being de-containerised at clean room at SDSC SHAR
Container with IRNSS-1G is being loaded on to the truck for  transportation to SDSC SHAR from ISITE, ISAC Bengaluru
IRNSS-1G being loaded into Large Space Simulation Chamber (LSSC) for thermal vacuum test
IRNSS-1G being prepared for a pre-launch test
IRNSS-1G during initial phase of integration

IRNSS Programme

  • PSLV-C22/IRNSS-1A
  • PSLV-C24/IRNSS-1B
  • PSLV-C26/IRNSS-1C
  • PSLV-C27/IRNSS-1D
  • PSLV-C31/IRNSS-1E
  • PSLV-C32/IRNSS-1F
  • PSLV-C33/IRNSS-1G
    • IRNSS-1G
    • Make your own IRNSS-1G Model
    • PSLV-C33 / IRNSS-1G Brochure
    • PSLV-C33/IRNSS-1G Gallery
  • PSLV-C41/IRNSS-1I

Related News

  • Real Time simulation & Data transmission checks completed. Vehicle Internal Checks Completed.
    Date: Apr 28, 2016
  • Propellant (N2O4 and UH25) filling operations of Second Stage (PS2) are completed by midnight. Countdown is progressing normally.
    Date: Apr 28, 2016
  • Mobile Service Tower(MST) withdrawal to parking End is completed.
    Date: Apr 27, 2016
  • Countdown operations are progressing normally. Preparations for Mobile Service Tower (MST) withdrawal and Propellant filling operation of second stage (PS2) are in progress.
    Date: Apr 27, 2016
  • Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 is completed.Countdown is progressing normally
    Date: Apr 26, 2016
  • MMH propellant filling operation has been completed. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 are under progress.
    Date: Apr 26, 2016
  • Mono Methyl Hydrazine (MMH) propellant filling operation of fourth stage (PS4) of PSLV-C33 is commenced and is under process
    Date: Apr 26, 2016
  • The 51 hr 30 min countdown activity of PSLV-C33/IRNSS-1G Mission has started at 9:20 hr IST today, Tuesday, April 26, 2016
    Date: Apr 26, 2016
  • Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 51.5 hr countdown starting at 09:20hr IST on Tuesday, April 26, 2016 and the launch of PSLV-C33/IRNSS-1G Mission for Thursday, April 28, 2016 at 12:50 hr. IST
    Date: Apr 25, 2016

Pages

  • « first
  • ‹ previous
  • 1
  • 2

 Site Map |  Timeline |  FAQ |   Disclaimer |  Careers |   Feedback |   Contact us |   Help

PUBLIC NOTICE - ATTENTION : JOB ASPIRANTS

Copyright © 2022 ISRO, All Rights Reserved. Terms of Use |   Privacy Policy CQW isro website