G O V E R N M E N T   O F   I N D I A  
Skip to main content A- A A+ Facebook Twitter
Home/IRNSS Programme/PSLV-C33/IRNSS-1G
150 Years of Celebrating the MahatmaNational Emblem ISRO Logo
Department of Space, Indian Space Research Organisation

PUBLIC NOTICE - ATTENTION : JOB ASPIRANTS

Watch Live Launch of PSLV-C51/Amazonia-1 on February 28, 2021 from 09:50 hrs IST
Humans Space Policy for India-2021 - Last date for public comments by 28.02.2021
Announcement of Opportunity for Space theme based Merchandize
Last date extended to Mar 31, 2021 for the Recruitment to the post of Chief Controller, Vikram Sarabhai Space Centre (VSSC), Thiruvananthapuram

Search form

  • English
  • हिन्दी
  • Missions
  • Spacecraft
  • Launchers
  • Applications
  • Media
  • About
  • Request transponder capacity
  • Chandrayaan 2
Home/IRNSS Programme/PSLV-C33/IRNSS-1G

PSLV-C33/IRNSS-1G Gallery

PSLV-C33 Lift off
PSLV-C33 Lift off
PSLV-C33 Lift off
Side View of Fully integrated PLSV-C33
Fully integrated PLSV-C33 with IRNSS-1G at First Launch Pad, SHAR Sriharikota
PSLV-C33  heat shield closed with IRNSS-1G encapsulated
IRNSS-1G spacecraft integrated with PSLV-C33 with two halves of the heat shields seen
Fuel filling of IRNSS-1G in progress at SDSC SHAR
Second stage  of PSLV-C33 being prepared for vehicle integration
PSLV-C33 core stage integrated over the  launch pedestal
IRNSS-1G at clean room at SDSC SHAR
IRNSS-1G being de-containerised at clean room at SDSC SHAR
Container with IRNSS-1G is being loaded on to the truck for  transportation to SDSC SHAR from ISITE, ISAC Bengaluru
IRNSS-1G being loaded into Large Space Simulation Chamber (LSSC) for thermal vacuum test
IRNSS-1G being prepared for a pre-launch test
IRNSS-1G during initial phase of integration

IRNSS Programme

  • PSLV-C22/IRNSS-1A
  • PSLV-C24/IRNSS-1B
  • PSLV-C26/IRNSS-1C
  • PSLV-C27/IRNSS-1D
  • PSLV-C31/IRNSS-1E
  • PSLV-C32/IRNSS-1F
  • PSLV-C33/IRNSS-1G
    • IRNSS-1G
    • Make your own IRNSS-1G Model
    • PSLV-C33 / IRNSS-1G Brochure
    • PSLV-C33/IRNSS-1G Gallery
  • PSLV-C41/IRNSS-1I

Related News

  • Orbit Determination results from fourth LAM firing are : apogee X perigee height was changed to 35811 km,35211 km,Inclination is 5.1 deg. Orbital period now is 23 hr 42 min 04 sec
    Date: May 03, 2016
  • The fourth and the final LAM firing of IRNSS-1G, for 231sec has been successfully completed on 03.05.2016 starting from 01:27hr IST
    Date: May 03, 2016
  • Orbit Determination results from the third LAM firing are: apogee X perigee height was changed to 35813km, 29050km, Inclination is 5.72deg. Orbital period now is 21hr 08m 09sec
    Date: May 02, 2016
  • Third LAM firing of IRNSS-1G, for 1609sec has been successfully completed on 01.05.2016 starting from 06:59:07 hr IST.
    Date: May 01, 2016
  • Orbit Determination results from second LAM firing are:apogee X perigee height was changed to 35803km,7750km,Inclination is 10.77deg.Orbital period now is 13h 03m 35sec
    Date: May 01, 2016
  • PSLV-C33 / IRNSS-1G Update : Second LAM firing of IRNSS-1G, at apogee for 1581 sec has been successfully completed on April 30, 2016 starting from 04:52:17 hrs IST.
    Date: Apr 30, 2016
  • PSLV-C33 / IRNSS-1G Update : The first apogee raise maneuver of IRNSS-1G has been successfully carried out for 1147 sec from 13:05 hrs IST on April 29,2016.
    Date: Apr 30, 2016
  • PSLV-C33 Successfully Launches India's Seventh Navigation Satellite IRNSS-1G
    Date: Apr 28, 2016
  • PSLV-C33 / IRNSS-1G Update : Lift off normal
    Date: Apr 28, 2016
  • Mission Director has authorised Vehicle Director for launch. Automatic Launch Sequence (ALS) program initiation authorised by Vehicle Director and ALS started for launch at 12:38 hrs IST.
    Date: Apr 28, 2016

Pages

  • 1
  • 2
  • next ›
  • last »
more

 Site Map |  Timeline |  FAQ |   Disclaimer |  Careers |   Feedback |   Contact us |   Help

PUBLIC NOTICE - ATTENTION : JOB ASPIRANTS

Copyright © 2021 ISRO, All Rights Reserved. Terms of Use |   Privacy Policy CQW isro website