G O V E R N M E N T   O F   I N D I A  
Skip to main content A- A A+ Facebook Twitter
Home/GSLV-Mk III - M1 / Chandrayaan-2 Mission
150 Years of Celebrating the MahatmaNational Emblem ISRO Logo
Department of Space, Indian Space Research Organisation

Search form

  • English
  • हिन्दी
  • Missions
  • Spacecraft
  • Launchers
  • Applications
  • Media
  • About
  • Request transponder capacity
  • Chandrayaan 2
Home/GSLV-Mk III - M1 / Chandrayaan-2 Mission

Chandrayaan-2 Mission Gallery

Images of Lunar Surface captured by Terrain Mapping Camera -2 (TMC-2) of Chandrayaan 2
Images of Lunar Surface captured by Terrain Mapping Camera -2 (TMC-2) of Chandrayaan 2
Images of Lunar Surface captured by Terrain Mapping Camera -2 (TMC-2) of Chandrayaan 2
Moon as viewed by Chandrayaan-2 LI4 Camera on 21 August 2019 19:03 UT
First set of beautiful images of the Earth captured by Chandrayaan-2 Vikram Lander
First set of beautiful images of the Earth captured by Chandrayaan-2 Vikram Lander
First set of beautiful images of the Earth captured by Chandrayaan-2 Vikram Lander
First set of beautiful images of the Earth captured by Chandrayaan-2 Vikram Lander
First set of beautiful images of the Earth captured by Chandrayaan-2 Vikram Lander
Viewers gallery image 1
Viewers gallery image 2
Viewers gallery image 3
Viewers gallery image 4
Viewers gallery image 5
Viewers gallery image 6
Viewers gallery image 7
Viewers gallery image 8
Viewers gallery image 9
Viewers gallery image 10
Viewers gallery image 11
Viewers gallery image 12
Viewers gallery image 13
Viewers gallery image 14
Lift_off_image1 (1)
Lift_off_image1 (2)
Lift_off_image1 (3)
GSLV MkIII-M1 / Chandryaan 2 vehicle night view at the Second Launch Pad
Another view of GSLV MkIII-M1 vehicle at the Second Launch Pad
GSLV MkIII-M1 vehicle at the Second Launch Pad
GSLV MkIII-M1 vehicle mounted on Mobile Launch Pedestal moving towards the Second Launch Pad
A view of GSLV MkIII-M1 vehicle on its way to the Second Launch Pad
GSLV MarkIII-M1 vehicle coming out of the Vehicle Assembly Building
Fully integrated GSLV MkIII-M1 at the Vehicle Assembly Building
Vikram lander mounted on top of the orbiter of chandrayaan2
Hoisting of Vikram lander during Chandrayaan2 spacecraft integration at launch centre
Pragyan Rover mounted on the ramp projecting from out of the sides of vikram lander
Pragyan Rover
Chandrayaan2 Orbiter
Chandrayaan2 Orbiter at launch centre
Hoisting of the equipment bay of GSLVMkIII M1 Vehicle during integration
Integration of c25 cryogenic stage toL110 stage in progress
C25 Cryogenic stage at vehicle assembly building for vehicle integration
Transportation of partially integrated GSLV MkIII M1 vehicle on Mobile launch pedestal
l110 stage integrated with s200
hoisting of l110 stage for integration with s200
transportation of liquid l110 stage for integration
hoisting of a slanted nose cone of s200 after the placement of s200 solid booster on mobile launch pedestal
placement of one of the s200 solid boosters of gslv mkiii m1 vehicle on mobile launch pedestal
one of the segments of an s200 booster being carried during vehicle integration

GSLV-Mk III - M1 / Chandrayaan-2 Mission

  • Launch Kit at a glance
  • Chandrayaan-2 Mission Gallery
  • Curtain Raiser video (Hindi)
  • Chandrayaan - 2 Video
  • Curtain Raiser Video (English)
  • Honorable Prime Minister Congratulates Team ISRO for the successful launch of Chandrayaan-2
  • Lift-off and Onboard Camera View of GSLV MkIII-M1/Chandrayaan2 Launch
  • First set of beautiful images of the Earth captured by Chandrayaan-2 Vikram Lander
  • Chandrayaan - 2 About Vikram Lander
  • Chandrayaan 2 - About Pragya Rover

Related News

  • Topographic Mapping Using TMC-2 of Chandrayaan-2: Initial Results
    Date: Nov 13, 2019
  • Detection of Argon-40 in the lunar exosphere
    Date: Oct 31, 2019
  • Initial imaging and observations by Chandrayaan-2 Dual-Frequency Synthetic Aperture Radar (DF-SAR)
    Date: Oct 22, 2019
  • Chandrayaan-2 begins spectroscopic studies of lunar surface
    Date: Oct 17, 2019
  • Solar flare observed by the Solar X-ray Monitor on Chandrayaan-2
    Date: Oct 10, 2019
  • Chandrayaan2 - Images from the Orbiter High Resolution Camera
    Date: Oct 04, 2019
  • Studying Earth’s extended magnetosphere (geotail)plasma around Moon
    Date: Oct 03, 2019
  • Update on Chandrayaan – 2
    Date: Sep 19, 2019
  • Chandrayaan 2: Vikram lander has been located by the orbiter
    Date: Sep 10, 2019
  • Chandrayaan - 2 Latest Update
    Date: Sep 07, 2019

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • next ›
  • last »
more

 Site Map |  Timeline |  FAQ |   Disclaimer |  Careers |   Feedback |   Contact us |   Help

Copyright © 2017 ISRO, All Rights Reserved. Terms of Use |   Privacy Policy CQW isro website